Hub / Home
Directory & Insights
Live Journey Map
Crowdsourced Live Journey
Timetables
Train Schedules
Search Routes
Direct & Transit Finder
Extraordinary Trains (EOT)
Extraordinary Trains
Train Directory
Master Train Fleet
Fleet Database
Rolling Stock Info
Stations
Facilities & Hubs
Facilities
Depots & Workshops
Operating Areas
Daop & Divre
Incidents & Safety (EOE)
Historical Rail Incidents
Updates & News
Railway Dispatches & Insights
Photo Gallery
Curated Collection
alurail pass
Supporter Perks
About alurail
Platform Info & Vision
Kereta Barang
Gapeka 2025
Active on Line Now
KA Nitahan
Main Corridor:
Niru (NRU) Tarahan (THN)
Nitahan is a prominent Kereta Api Indonesia general freight service connecting Niru to Tarahan in South Sumatra. It ensures reliable, high-volume industrial bulk transport across the 347-kilometer corridor to support regional supply chain efficiency.
Summarized by Gemini AI
Daily Trips
4
2 Through Services (4 Legs)
Average Duration
± 13h 42m
Through Journey Average
Route Distance
347 km
Full Journey Distance
Calling Stops
15
Scheduled Halts
Service Overview & Profile
Nitahan is a prominent general freight and bulk train service operated by Kereta Api Indonesia, dedicated to supporting the heavy industrial logistics network in the southern region of Sumatra. Historically established to streamline the distribution of essential commodities, the service plays a critical economic role by connecting the industrial heartland of Niru with the vital maritime gateway of Tarahan. This strategic corridor serves as a crucial economic artery, facilitating the high-volume transport of raw materials and goods, thereby reducing highway congestion and supporting regional industrial output.
The service is renowned for its operational reliability, functioning as a cornerstone for supply chain efficiency across the South Sumatra rail network. By utilizing dedicated freight locomotives and rolling stock, Nitahan offers seamless intermodal transport advantages, bridging inland production sites directly with port facilities at Tarahan for onward maritime distribution. This systematic approach minimizes transit bottlenecks, ensures predictable delivery schedules for industrial stakeholders, and provides a cost-effective, environmentally sustainable alternative to long-haul road freight.
Under the current rail operating graph (Gapeka 2025), Nitahan operates 4 scheduled trips across a route distance of approximately 347 kilometers. The service traverses and serves 15 scheduled stations along its primary corridor, carefully balancing regional rail traffic to maintain schedule integrity. The average transit time for the complete journey between Niru and Tarahan is approximately 13 hours and 42 minutes, reflecting the operational demands of heavy-freight handling and single-track rail management in the region.
The service is renowned for its operational reliability, functioning as a cornerstone for supply chain efficiency across the South Sumatra rail network. By utilizing dedicated freight locomotives and rolling stock, Nitahan offers seamless intermodal transport advantages, bridging inland production sites directly with port facilities at Tarahan for onward maritime distribution. This systematic approach minimizes transit bottlenecks, ensures predictable delivery schedules for industrial stakeholders, and provides a cost-effective, environmentally sustainable alternative to long-haul road freight.
Under the current rail operating graph (Gapeka 2025), Nitahan operates 4 scheduled trips across a route distance of approximately 347 kilometers. The service traverses and serves 15 scheduled stations along its primary corridor, carefully balancing regional rail traffic to maintain schedule integrity. The average transit time for the complete journey between Niru and Tarahan is approximately 13 hours and 42 minutes, reflecting the operational demands of heavy-freight handling and single-track rail management in the region.