Hub / Home
Directory & Insights
Live Journey Map
Crowdsourced Live Journey
Timetables
Train Schedules
Search Routes
Direct & Transit Finder
Extraordinary Trains (EOT)
Extraordinary Trains
Train Directory
Master Train Fleet
Fleet Database
Rolling Stock Info
Stations
Facilities & Hubs
Facilities
Depots & Workshops
Operating Areas
Daop & Divre
Incidents & Safety (EOE)
Historical Rail Incidents
Updates & News
Railway Dispatches & Insights
Photo Gallery
Curated Collection
alurail pass
Supporter Perks
About alurail
Platform Info & Vision
Stasiun Muara Saling (MSL)
Operational details, station classification, elevation, first & last train timetables, and departure schedule for Station Muara Saling, Kab. Empat Lawang.
Divisi Regional III - Palembang
City / Regency: Kab. Empat Lawang
Class III Station
Ministry of Transportation PM 29/2011
6 Calling Trains
Active Timetable Calling Stops
Palembang (3), Lubuklinggau (3)
Scheduled Train Termini
No Verified Photos Yet
Be the first to submit photographic documentation for Station Muara Saling to the official alurail gallery.
| Waktu Time |
Kereta Api Train |
Tujuan Bound for |
Status Estimated Time of Departure |
|---|
Station History & Overview
Muara Saling station (MSL), designated as a Class III station situated at an elevation of +91 meters, is an integral operational facility within the jurisdiction of Regional Division III Palembang. Located in Empat Lawang Regency, South Sumatra, the station reflects the functional architectural heritage characteristic of colonial-era and post-independence expansion phases designed to support heavy logistical and passenger transit corridors inland from Palembang. Its layout features a modest platform yard configuration optimized primarily for managing single-line regional traffic operations, facilitating essential train crosses and overtakes along the challenging terrain of the Southern Sumatra railway network.
Within the national railway transit network, Muara Saling plays a vital role in maintaining the continuity and safety of intercity connectivity between major hubs like Kertapati and Lubuklinggau. By bridging remote rural districts with larger urban centers, the station supports local socioeconomic mobility and the arterial movement of freight. Despite its rural setting and modest classification, the station remains a critical node in sustaining the overall operational capacity, scheduling reliability, and logistical reach of the region's rail infrastructure.
Within the national railway transit network, Muara Saling plays a vital role in maintaining the continuity and safety of intercity connectivity between major hubs like Kertapati and Lubuklinggau. By bridging remote rural districts with larger urban centers, the station supports local socioeconomic mobility and the arterial movement of freight. Despite its rural setting and modest classification, the station remains a critical node in sustaining the overall operational capacity, scheduling reliability, and logistical reach of the region's rail infrastructure.
Operating Region
Divisi Regional III - Palembang
Station Elevation
+91 mdpl
First Train
Sindang Marga (S1) 01:41
Last Train
Sindang Marga (S2) 20:15
Freight & Cargo Trains
Freight / Cargo
Intercity Trains
Long-distance Train (KAJJ)
Trains Calling & Departing at Station Muara Saling
Displaying all scheduled active train services on GAPEKA 2025. Radar link appears when a train is currently running on the line.
| No | Train No. | Train Name | Route | Arrival | Departure | Dwell Time | Action |
|---|---|---|---|---|---|---|---|
| 1 | S1 | Sindang Marga |
Kertapati (KPT)
|
01:41 | 01:41 | Direct | |
| 2 | 3993 | Linggapati |
Kertapati (KPT)
|
07:27 | 07:27 | Direct | |
| 3 | S10 | Bukit Serelo |
Lubuklinggau (LLG)
|
10:49 | 10:49 | Direct | |
| 4 | S9 | Bukit Serelo |
Kertapati (KPT)
|
14:33 | 14:35 | 2 min | |
| 5 | 3992 | Linggapati |
Pos Lubuklinggau (POSLLG)
|
16:07 | 16:07 | Direct | |
| 6 | S2 | Sindang Marga |
Lubuklinggau (LLG)
|
20:15 | 20:15 | Direct |