Hub / Home
Directory & Insights
Live Journey Map
Crowdsourced Live Journey
Timetables
Train Schedules
Search Routes
Direct & Transit Finder
Extraordinary Trains (EOT)
Extraordinary Trains
Train Directory
Master Train Fleet
Fleet Database
Rolling Stock Info
Stations
Facilities & Hubs
Facilities
Depots & Workshops
Operating Areas
Daop & Divre
Incidents & Safety (EOE)
Historical Rail Incidents
Updates & News
Railway Dispatches & Insights
Photo Gallery
Curated Collection
alurail pass
Supporter Perks
About alurail
Platform Info & Vision
Stasiun Sicincin (SCN)
Operational details, station classification, elevation, first & last train timetables, and departure schedule for Station Sicincin, Kab. Padang Pariaman.
Divisi Regional II - Padang
City / Regency: Kab. Padang Pariaman
Class III Station
Ministry of Transportation PM 29/2011
9 Calling Trains
Active Timetable Calling Stops
Kab. Padang Pariaman (6), Padang (3)
Scheduled Train Termini
No Verified Photos Yet
Be the first to submit photographic documentation for Station Sicincin to the official alurail gallery.
| Waktu Time |
Kereta Api Train |
Tujuan Bound for |
Status Estimated Time of Departure |
|---|
Station History & Overview
Sicincin station (SCN), designated as a Class III station, is situated at an elevation of +89 meters within Padang Pariaman Regency, West Sumatra, and operates under the jurisdiction of Divisi Regional II Padang. Established during the Dutch colonial era as part of the ambitious regional railway expansion to connect West Sumatra’s highland agricultural interior with the coastal port of Teluk Bayur, the station features classic Indies-style architectural elements characterized by thick masonry walls, prominent eaves, and utilitarian colonial design tailored to the tropical climate.
The station yard is configured with a modest track layout, typically comprising a main line and a passing loop to facilitate single-track operations typical of the region. As a vital node within the national railway transit network, Sicincin plays an essential role in supporting local passenger mobility and rural connectivity across Padang Pariaman. Despite the challenges of modernizing heritage infrastructure, the station remains an integral component of West Sumatra’s surviving railway heritage, bridging historical regional commerce with contemporary public transportation services.
The station yard is configured with a modest track layout, typically comprising a main line and a passing loop to facilitate single-track operations typical of the region. As a vital node within the national railway transit network, Sicincin plays an essential role in supporting local passenger mobility and rural connectivity across Padang Pariaman. Despite the challenges of modernizing heritage infrastructure, the station remains an integral component of West Sumatra’s surviving railway heritage, bridging historical regional commerce with contemporary public transportation services.
Operating Region
Divisi Regional II - Padang
Station Elevation
+89 mdpl
First Train
Lembah Anai (B51A) 05:41
Last Train
Lembah Anai (B62) 21:00
L
KA Lembah Anai
Commuter Line / Local
Trains Calling & Departing at Station Sicincin
Displaying all scheduled active train services on GAPEKA 2025. Radar link appears when a train is currently running on the line.
| No | Train No. | Train Name | Route | Arrival | Departure | Dwell Time | Action |
|---|---|---|---|---|---|---|---|
| 1 | B51A | L Lembah Anai |
Kayu Tanam (KTN)
|
05:40 | 05:41 | 1 min | |
| 2 | B52A | L Lembah Anai |
Padang (PD)
|
09:58 | 09:59 | 1 min | |
| 3 | B53A | L Lembah Anai |
Kayu Tanam (KTN)
|
11:51 | 11:52 | 1 min | |
| 4 | B58 | L Lembah Anai |
Duku (DUK)
|
14:45 | 14:46 | 1 min | |
| 5 | B54A | L Lembah Anai |
Padang (PD)
|
15:34 | 15:35 | 1 min | |
| 6 | B55A | L Lembah Anai |
Kayu Tanam (KTN)
|
16:30 | 16:31 | 1 min | |
| 7 | B59 | L Lembah Anai |
Kayu Tanam (KTN)
|
17:23 | 17:24 | 1 min | |
| 8 | B56A | L Lembah Anai |
Padang (PD)
|
20:18 | 20:19 | 1 min | |
| 9 | B62 | L Lembah Anai |
Duku (DUK)
|
20:59 | 21:00 | 1 min |