Hub / Home
Directory & Insights
Live Journey Map
Crowdsourced Live Journey
Timetables
Train Schedules
Search Routes
Direct & Transit Finder
Extraordinary Trains (EOT)
Extraordinary Trains
Train Directory
Master Train Fleet
Fleet Database
Rolling Stock Info
Stations
Facilities & Hubs
Facilities
Depots & Workshops
Operating Areas
Daop & Divre
Incidents & Safety (EOE)
Historical Rail Incidents
Updates & News
Railway Dispatches & Insights
Photo Gallery
Curated Collection
alurail pass
Supporter Perks
About alurail
Platform Info & Vision
Kereta Barang
Gapeka 2025
KA Cilawalu Tanker
Main Corridor:
Rewulu (RWL) Cilacap (CP)
The Cilawalu Tanker provides a vital, high-reliability fuel logistics link across Central Java, connecting Rewulu and Cilacap. This optimized rail service ensures secure, efficient energy distribution through a structured, daily industrial supply chain.
Summarized by Gemini AI
Daily Trips
2
Active Operational Trips
Average Duration
± 4h 25m
Per Journey Leg
Route Distance
159 km
Average Track Length
Calling Stops
6
Scheduled Halts
Service Overview & Profile
The Cilawalu Tanker is an established Indonesian freight train service dedicated to the bulk transportation of petroleum and liquid fuels, operated by Kereta Api Indonesia (KAI) in synergy with state energy enterprise Pertamina. Historically serving as a vital logistics backbone for the southern corridor of Java, the service underpins regional energy security by seamlessly connecting the primary fuel terminal at Rewulu in Yogyakarta with the major distribution hub in Cilacap, Central Java. This rail corridor holds profound economic significance, bypassing highway congestion to ensure a steady, uninterrupted flow of combustible resources essential for industrial and domestic consumption across the provinces.
As a cornerstone of modern supply chain efficiency, the service delivers exceptional operational reliability by mitigating the logistical risks and environmental liabilities associated with long-distance road tanker fleets. The deployment of dedicated rail tankers leverages the inherent advantages of intermodal transport, consolidating massive volumes of hazardous materials into a single, highly regulated transit system that significantly reduces carbon emissions per ton-kilometer. By integrating directly with regional terminal infrastructure, the Cilawalu Tanker optimizes terminal turnaround times and maintains a dependable inventory cadence for downstream distribution networks.
Operating under the national rail graph Gapeka 2025, the Cilawalu Tanker executes a structured operational schedule consisting of 2 scheduled trips daily across a route distance of approximately 159 kilometers. The service efficiently navigates a network comprising 6 scheduled stations along the Central Java corridor, achieving an average transit time of 4 hours and 25 minutes. These specific technical parameters reflect a highly optimized operational tempo, balancing stringent safety protocols for hazardous cargo with the agility required to maintain fluid movement through densely populated and topographically diverse rail corridors.
As a cornerstone of modern supply chain efficiency, the service delivers exceptional operational reliability by mitigating the logistical risks and environmental liabilities associated with long-distance road tanker fleets. The deployment of dedicated rail tankers leverages the inherent advantages of intermodal transport, consolidating massive volumes of hazardous materials into a single, highly regulated transit system that significantly reduces carbon emissions per ton-kilometer. By integrating directly with regional terminal infrastructure, the Cilawalu Tanker optimizes terminal turnaround times and maintains a dependable inventory cadence for downstream distribution networks.
Operating under the national rail graph Gapeka 2025, the Cilawalu Tanker executes a structured operational schedule consisting of 2 scheduled trips daily across a route distance of approximately 159 kilometers. The service efficiently navigates a network comprising 6 scheduled stations along the Central Java corridor, achieving an average transit time of 4 hours and 25 minutes. These specific technical parameters reflect a highly optimized operational tempo, balancing stringent safety protocols for hazardous cargo with the agility required to maintain fluid movement through densely populated and topographically diverse rail corridors.