Hub / Home
Directory & Insights
Live Journey Map
Crowdsourced Live Journey
Timetables
Train Schedules
Search Routes
Direct & Transit Finder
Extraordinary Trains (EOT)
Extraordinary Trains
Train Directory
Master Train Fleet
Fleet Database
Rolling Stock Info
Stations
Facilities & Hubs
Facilities
Depots & Workshops
Operating Areas
Daop & Divre
Incidents & Safety (EOE)
Historical Rail Incidents
Updates & News
Railway Dispatches & Insights
Photo Gallery
Curated Collection
alurail pass
Supporter Perks
About alurail
Platform Info & Vision
Kereta Barang
Gapeka 2025
Active on Line Now
KA Simpangmuara
Main Corridor:
Muara Lawai (MLI) POS C Simpang (POSCSIG)
The Simpangmuara freight service provides high-capacity, reliable bulk transport between Muara Lawai and POS C Simpang. Operating under Gapeka 2025 standards, it ensures efficient, high-frequency logistics to support regional industrial productivity.
Summarized by Gemini AI
Daily Trips
16
Active Operational Trips
Average Duration
± 2h 58m
Per Journey Leg
Route Distance
147 km
Average Track Length
Calling Stops
2
Scheduled Halts
Service Overview & Profile
The Simpangmuara freight service represents a critical logistical artery within the Indonesian railway network, specifically designed to facilitate the bulk transport of commodities between Muara Lawai and the POS C Simpang terminal. Historically, this corridor has served as a vital link in the national supply chain, bridging inland resource extraction zones with strategic distribution hubs. By providing a dedicated rail-based solution, the service plays an essential role in the economic development of the region, reducing reliance on road-based heavy vehicle transport and alleviating congestion on provincial arterial routes.
Operational reliability remains the hallmark of the Simpangmuara service, which is engineered to ensure consistent supply chain efficiency for industrial stakeholders. By leveraging the inherent advantages of rail, the service offers a high-capacity, intermodal transport framework that minimizes transit variability and enhances safety standards. This systematic approach to bulk logistics allows for the seamless integration of raw materials into broader industrial processes, ensuring that downstream operations maintain optimal productivity levels through predictable and high-volume delivery cycles.
The technical parameters of the Simpangmuara service are defined by rigorous scheduling and performance benchmarks established under the Gapeka 2025 framework. The service operates 16 scheduled trips, connecting 2 primary stations along a route distance of approximately 147 km. With an average transit time of 2 hours and 58 minutes, the operation is optimized for high-frequency throughput. These metrics underscore the service's commitment to precision, ensuring that the logistical requirements of the corridor are met with technical efficiency and consistent operational availability.
Operational reliability remains the hallmark of the Simpangmuara service, which is engineered to ensure consistent supply chain efficiency for industrial stakeholders. By leveraging the inherent advantages of rail, the service offers a high-capacity, intermodal transport framework that minimizes transit variability and enhances safety standards. This systematic approach to bulk logistics allows for the seamless integration of raw materials into broader industrial processes, ensuring that downstream operations maintain optimal productivity levels through predictable and high-volume delivery cycles.
The technical parameters of the Simpangmuara service are defined by rigorous scheduling and performance benchmarks established under the Gapeka 2025 framework. The service operates 16 scheduled trips, connecting 2 primary stations along a route distance of approximately 147 km. With an average transit time of 2 hours and 58 minutes, the operation is optimized for high-frequency throughput. These metrics underscore the service's commitment to precision, ensuring that the logistical requirements of the corridor are met with technical efficiency and consistent operational availability.