alurail alurail
Home & Hub Live Journey Map Timetables Route Search Special Trains (KLB) Train Directory Fleet Database Station Directory Facilities & Depots Operating Areas Safety & Incidents Updates & News Photo Gallery alurail pass
User Suite
Map Home Timetables Fleet
alurail alurail
Hub / Home Directory & Insights
Live Journey Map Crowdsourced Live Journey
Timetables Train Schedules
Search Routes Direct & Transit Finder
Extraordinary Trains (EOT) Extraordinary Trains
Train Directory Master Train Fleet
Fleet Database Rolling Stock Info
Stations Facilities & Hubs
Facilities Depots & Workshops
Operating Areas Daop & Divre
Incidents & Safety (EOE) Historical Rail Incidents
Updates & News Railway Dispatches & Insights
Photo Gallery Curated Collection
alurail pass Supporter Perks
About alurail Platform Info & Vision
Sign In / Account
Back to Updates • Infrastructure, Exploration
Live Radar alurail Pass Submit Photo
Live Journey / Updates / Indonesian Railway Records: Longest Tunnels, Highest Station Nagreg & Extreme Bridges 2026
Infrastructure Exploration 2 October 2026 • Updated 20 November 2026

Indonesian Railway Records: Longest Tunnels, Highest Station Nagreg & Extreme Bridges 2026

A comprehensive technical exploration of 158 verified WGS84 geospatial rail waypoints across Indonesia's active railway network. Analyzing national tunnel length records, extreme elevation gradients from sea level to volcanic mountain passes, deep valley viaducts, and regional distribution across Java, Sumatra, and Sulawesi.
alurail Editorial Team
Staff Writer & Rail Researcher • 1,687 views
Indonesian Railway Records: Longest Tunnels, Highest Station Nagreg & Extreme Bridges 2026
Table of Contents
  1. 1. 1. Geospatial Methodology and Operational Demarcation of Active Lines (2026)
  2. 2. 2. Cross-Technical Analysis of Active Railway Tunnels
  3. 3. 3. Extreme Elevation Profiles: From Sea-Level Coasts to Priangan Summits
  4. 4. 4. Engineering Marvels: Deep Valley Viaducts and Karst Crossings
  5. 5. 5. Geodetic Extrema of the National Railway Network
  6. 6. 6. Policy Implications for GAPEKA 2026 Intermodal Integration
  7. 7. Frequently Asked Questions (FAQ) About Indonesia's Railway Infrastructure

Executive Summary: Indonesia Active Railway Geospatial Atlas 2026

Based on comprehensive geospatial research conducted by alurail ahead of the national GAPEKA 2026 timetable, Indonesia's active railway network spans Java, Sumatra, and Sulawesi across 158 verified waypoints under the WGS84 datum. This geodatabase encompasses all regular and scheduled heritage services: nine Operational Regions (Daop 1–9), four Regional Divisions (Divre 1–4), Subdivre 1.1 Aceh, KCIC Whoosh high-speed rail, Jakarta MRT, Jabodebek LRT, Jakarta LRT (including the Phase 1B Velodrome–Manggarai extension operational in September 2026), South Sumatra LRT, Ambarawa cog railway, and the Trans-Sulawesi corridor (Mandai–Palanro segment). This analytical report dissects national tunnel engineering records, record-breaking deep valley viaducts, extreme elevations from 0 m to +848 m ASL, and geodetic extrema with verified spatial accuracy.

WGS84 Rail Waypoints
158 Pts
Java (99), Sumatra (45), Sulawesi (14)
Longest Tunnel in RI
4,478 Meters
Tunnel 6 KCIC Cikalongwetan (HSR)
Highest Active Station
+848 m ASL
Nagreg Station (Daop 2 Bandung)
Tallest Railway Bridge
100 Meters
New Cisomang Viaduct (BH 513)

1. Geospatial Methodology and Operational Demarcation of Active Lines (2026)

Mapping railway infrastructure across Indonesia's archipelagic geography requires strict geospatial criteria to delineate revenue-earning operational lines from uncommissioned construction sites and non-active heritage routes. All 158 coordinates featured in this research have been verified under the WGS84 datum (World Geodetic System 1984) with standard international decimal precision. Geographic anchoring is established on official passenger station centroids, tunnel portal mouths (west/east/north/south portals), major viaduct piers, and verified open georeferenced viewpoints.

Rigorous operational demarcation is essential in 2026 due to extensive simultaneous railway expansion nationwide. To ensure analytical integrity, this report explicitly clarifies the status of several high-profile corridors:

  • Jakarta MRT Phase 2A (Bundaran HI–Kota): As of October 2026, overall civil construction progress stands at 66.13%. The underground segment to Monas is scheduled for phased commissioning by late 2027, with the full corridor to Kota targeted for 2029. Consequently, Phase 2A stations are excluded from active operational inventory.
  • Jakarta LRT Phase 1B (Velodrome–Manggarai): This 6.4 km elevated extension commenced limited trial operations on September 10, 2026, followed by the functional opening of Manggarai LRT Station on September 16, 2026. These waypoints are classified as newly active infrastructure.
  • West Sumatra Inactive Mountain Railways: The historic cog corridor through Lembah Anai–Padang Panjang–Sawahlunto (including Anai Tunnels 1–2, Kupitan Tunnel, and Lubang Kalam) remains out of revenue service and is categorized as non-active heritage infrastructure.
  • Southern West Java Inactive Tunnels: The four colonial-era tunnels along the closed Banjar–Cijulang line (Wilhelmina/Sumber Tunnel at 1,116 m, Batulawang at 281 m, Hendrik at 105 m, and Juliana at 127 m) remain abandoned since their closure in the 1980s.
  • Trans-Sulawesi Commissioned Segment: As of November 2026, revenue service operates over 112 km between Mandai Station (Maros) and Palanro Station (Barru), following the extension opening on June 3, 2026. The southern terminal link (Mandai–Makassar) and northern section (Palanro–Parepare) remain under construction.
GEOSPATIAL INFOGRAPHIC: INDONESIA ACTIVE RAILWAY INFRASTRUCTURE Verified WGS84 Distribution, Engineering Tunnels, and Extreme Elevation Profiles (158 Waypoints) REGIONAL GEODETIC DISTRIBUTION Java Island (99 Pts / 62.7%) 62.7% Sumatra Island (45 Pts / 28.5%) 28.5% Sulawesi Island (14 Pts / 8.9%) 8.9% Total: 158 Titik Terverifikasi (Daop 1–9, Divre 1–4, KCIC, MRT, LRT, Trans-Sulawesi) EXTREME ELEVATION PROFILE (METERS ABOVE SEA LEVEL) Nagreg (+848 m) • Highest Active in RI Lebakjero (+818 m) Bumiwaluya (+641 m) Kotapadang (+598 m) • Highest in Sumatra Coast Termini: Pasarturi (+1 m), Senen (+4.7 m) Rentang Gradien Operasi: 0 m dpl (Pesisir Utara) hingga +848 m dpl (Lintas Priangan) TOP ACTIVE RAILWAY TUNNELS BY LENGTH (METERS) 1. Terowongan 6 KCIC (Cikalongwetan, Kereta Cepat) 4.478 m (Rekor RI) 2. Terowongan 1 KCIC (Halim–Bekasi, Underpass Tol) 1.885 m 3. Terowongan 4 KCIC (Plered, Purwakarta) 1.315 m 4. Terowongan 10 KCIC (Ngamprah, Bandung Barat) 1.230 m 5. Terowongan Sasaksaat (Daop 2 Bandung, 1.067 mm) 949 m (Rekor Konvensional) 6. Terowongan Karangkates I / Eka Bakti Karya (Daop 8) 741 m (Karya Pertama RI) 7. Terowongan Mrawan (Gunung Gumitir, Daop 9 Jember) 690 m 8. Terowongan Lampegan (Cianjur, Daop 2, 1879–1882) 686 m (Terowongan Tertua) 9. Terowongan Ijo Baru (Gombong, Daop 5 Purwokerto) 581 m (Jalur Ganda 120 km/jam) Source: alurail Geospatial Research • GAPEKA 2026 Baseline • Datum WGS84

2. Cross-Technical Analysis of Active Railway Tunnels

Indonesia's rugged terrain—shaped by volcanic mountain ranges and seismic fault lines—demanded extraordinary civil engineering solutions. For over a century, the title of Indonesia's longest active railway tunnel belonged to Sasaksaat Tunnel (BH 503) at 949 meters (959 meters in Daop 2 technical logs). Constructed between 1902 and 1903 by the colonial state railway Staatsspoorwegen (SS), Sasaksaat pierced the hard basalt bedrock of the Maswati–Sasaksaat mountain pass and remains the backbone of the southern Java mainline.

The inauguration of the Jakarta–Bandung High-Speed Railway (KCIC Whoosh) transformed Indonesia's subterranean engineering landscape. Designed for 350 km/h commercial speeds, the 142.3 km high-speed corridor incorporates 13 twin-track tunnels, with six exceeding one kilometer in length. KCIC Tunnel 6 in Cikalongwetan, West Bandung, stands as the longest tunnel in Indonesia at 4,478 meters—nearly five times the length of Sasaksaat. It is complemented by KCIC Tunnel 1 beneath the Jakarta–Cikampek expressway (1,885 m), Tunnel 4 in Plered (1,315 m), Tunnel 10 in Ngamprah (1,230 m), and Tunnel 11 in Padalarang (1,200 m).

Modernization on conventional 1,067 mm gauge tracks is equally evident in Central Java's double-tracking initiative (Daop 5 Purwokerto). Three narrow colonial-era single-track tunnels—Old Notog (1916), Old Kebasen (1916), and Old Ijo (1886)—were permanently retired between 2019 and 2020. They were replaced by wide-bore double-track tunnels designed for 120 km/h operating speeds: New Ijo Tunnel (BH 1649) spanning 581 meters, New Kebasen Tunnel (BH 1464A/B) spanning 793 meters combined, and New Notog Tunnel (BH 1440) spanning 473 meters. In East Java, Karangkates I Tunnel (Eka Bakti Karya) spanning 741 meters holds historical significance as the first major railway tunnel engineered and excavated entirely by Indonesian personnel (1965–1970) during the Sutami Dam diversion project.

Active Tunnel Name Bridge/Structure ID Line & Region Commissioned Length Track Type & Status WGS84 Coordinates / Anchor
KCIC Tunnel 6 – Cikalongwetan, West Bandung 2023 4,478 m High-Speed Rail (National Record) Anchor: Padalarang HSR (-6.841988, 107.496397)
KCIC Tunnel 1 – Halim (East Jakarta)–Bekasi 2023 1,885 m Expressway Underpass (HSR) West Portal Halim (-6.246471, 106.885241)
KCIC Tunnel 4 – Plered, Purwakarta 2023 1,315 m High-Speed Rail (Active) Plered Corridor (-6.652100, 107.382400)
KCIC Tunnel 10 – Ngamprah, West Bandung 2023 1,230 m High-Speed Rail (Active) Anchor: Padalarang (-6.841988, 107.496397)
KCIC Tunnel 11 – Padalarang, West Bandung 2023 1,200 m High-Speed Rail (Active) Anchor: Padalarang (-6.841988, 107.496397)
Sasaksaat Tunnel BH 503 Maswati–Sasaksaat (Daop 2) 1903 949 m Conventional Record (1,067 mm) South Portal (-6.775833, 107.435278)
Karangkates I Tunnel BH 357 Sumberpucung–Pogajih (Daop 8) 1970 741 m Eka Bakti Karya (First Domestic Tunnel) -8.157198, 112.445523 (Exact Centroid)
Mrawan Tunnel BH 152A Mrawan–Kalibaru (Daop 9) 1910 690 m Mount Gumitir Pass (Active) West Portal Mrawan (-8.269722, 113.923889)
Lampegan Tunnel BH 415 Cireungas–Lampegan (Daop 2) 1882 686 m Oldest Active Railway Tunnel in RI -6.953056, 107.058611 (Exact Portal)
New Ijo Tunnel BH 1649 Ijo–Gombong, Kebumen (Daop 5) 2020 581 m Double Track, 120 km/h Design -7.618600, 109.432800 (Exact)
New Kebasen Tunnel BH 1464A/B Notog–Kebasen, Banyumas (Daop 5) 2019 793 m (Tot.) Double Track (Tunnels A: 109 m + B: 684 m) -7.534200, 109.215500 (Exact)
New Notog Tunnel BH 1440 Notog, Banyumas (Daop 5) 2019 473 m Double Track, 120 km/h Design -7.498800, 109.216300 (Exact)
Tebing Tinggi Tunnel BH 87 Padang Ratu–Tebing Tinggi (Divre 3) 1930 424 m Longest Active Tunnel in Sumatra Anchor: Tebing Tinggi (-3.593611, 103.080556)
Gunung Gajah Tunnel BH 364 Lahat–Bunga Mas (Divre 3) 1932 368 m South Sumatra Heavy Coal Mainline Anchor: Lahat (-3.789167, 103.541944)

3. Extreme Elevation Profiles: From Sea-Level Coasts to Priangan Summits

The vertical gradient of Indonesia's railway network reflects extreme geographical contrast. Trains operate from mere centimeters above mean sea level along the northern coastal plains of East Java to steep mountain passes ascending nearly 900 meters in the Priangan highlands.

The crown of the highest operational railway station in Indonesia is held by Nagreg Station (NG) in Daop 2 Bandung at an elevation of +848 meters above sea level (-7.027065, 107.893175). Nestled in a narrow volcanic saddle between Cicalengka and Garut, Nagreg is flanked by demanding 25-permil gradients that test locomotive adhesion and dynamic braking. Right below Nagreg, Lebakjero Station (LBJ) occupies second place at +818 meters ASL (-7.065278, 107.925833), followed by Bumiwaluya Station (BMW) in the fog-prone Malangbong valley at +641 meters ASL (-7.112222, 108.134167). Historically, Cikajang Station (+1,246 m ASL) south of Garut held the record until its branch closure in 1982.

In Sumatra, the highest active operational station is located on the Bukit Barisan mountain slopes in Bengkulu province: Kotapadang Station (KOP) at +598 meters ASL (-3.344444, 102.838889), operated by Divre 3 Palembang on the Lubuklinggau passenger and freight mainline. Meanwhile, on the Ambarawa steam cog railway (Daop 4 Semarang), Bedono Station (BDN) crowns the summit at +711 meters ASL (-7.307500, 110.347778), where historic B25-class steam engines negotiate 65-permil gradients using mid-track Riggenbach rack systems.

Station Name Code Operational Region Elevation (ASL) Classification & Operating Role WGS84 Coordinates
Nagreg Station NG Daop 2 Bandung +848 m Highest Active Station in Indonesia -7.027065, 107.893175
Lebakjero Station LBJ Daop 2 Bandung +818 m Mountain Pass Crossing Loop (Mandalahaji) -7.065278, 107.925833
Garut Station GRT Daop 2 Bandung +717 m Reactivated Valley Terminus Station -7.212778, 107.908056
Bedono Station BDN Daop 4 Semarang +711 m Summit of Ambarawa Cog Wheel Railway (Scheduled Heritage) -7.307500, 110.347778
Bandung Station BD Daop 2 Bandung +709 m Highland Central Mainline Passenger Hub -6.912500, 107.602500
Bumiwaluya Station BMW Daop 2 Bandung +641 m Malangbong Gorge Crossing Point -7.112222, 108.134167
Kotapadang Station KOP Divre 3 Palembang +598 m Highest Active Station in Sumatra -3.344444, 102.838889
Jakarta Kota Station JAKK Daop 1 Jakarta +4 m Art-Deco Beos Terminus (Jakarta Bay Lowlands) -6.137559, 106.814589
Pasar Senen Station PSE Daop 1 Jakarta +4.7 m Central Intercity & Commuter Hub -6.174444, 106.844167
Surabaya Pasarturi Station SBI Daop 8 Surabaya +1 m Lowest Elevation on Northern Mainline -7.247500, 112.730556

4. Engineering Marvels: Deep Valley Viaducts and Karst Crossings

Formidable ravine topographies in West Java produced some of the most daring railway viaducts in the Southern Hemisphere. New Cisomang Viaduct (BH 513) in West Bandung regency holds the undisputed record as the highest active railway bridge in Indonesia, carrying rails 100 meters above the Cisomang riverbed. Built with seismic-damped composite steel truss piers and spanning 243 meters, this structure replaced the 1906 colonial viaduct whose piers shifted due to marl rock instability.

Located roughly seven kilometers southwest of Cisomang stands Cikubang Viaduct (BH 513), which holds the title of the longest active railway bridge on Java Island, spanning 300 meters on 80-meter-tall steel lattice piers (-6.758900, 107.412100). Passengers crossing Cikubang enjoy panoramic vistas of lush terraced valleys while viewing the elevated viaducts of the Whoosh high-speed rail line traversing parallel ridges in the background.

In Central Java, Sakalibel Bridge (BH 1153) near Bumiayu (Daop 5 Purwokerto) represents the country's most graceful curved arch viaduct. Derived from the Javanese saka rolas (twelve pillars), the original 1916 bridge was modernized in 2011 into a 298-meter double-track concrete arch span sweeping across the Kali Belang valley (-7.228611, 109.006944). In eastern Priangan, Cirahong Bridge (BH 1290) spanning 202 meters remains Indonesia's only functional bi-level transport bridge, accommodating trains on its upper truss and single-lane alternating vehicular traffic through its lower timber deck.

Railway Viaduct Name Structure ID Span Length Pier Height Line & Region Structural Characteristics WGS84 Coordinates
New Cisomang Viaduct BH 513 243 m 100 m Cisomang, West Bandung (Daop 2) Highest Railway Bridge in Indonesia -6.735000, 107.391667 (Viewpoint)
Cikubang Viaduct BH 513 300 m 80 m Padalarang, West Bandung (Daop 2) Longest Railway Bridge on Java -6.758900, 107.412100 (Anchor)
Sakalibel Curved Viaduct BH 1153 298 m 35 m Bumiayu, Brebes (Daop 5) Curved Double-Track Concrete Arch Viaduct -7.228611, 109.006944 (Exact)
Cirahong Deck Bridge BH 1290 202 m 66 m Manonjaya, Tasikmalaya (Daop 2) Bi-Level Deck (Upper: Railway, Lower: Roadway) -7.355278, 108.341389 (Exact)
Rammang-Rammang Karst Viaduct – Elevated 12–18 m Maros, South Sulawesi (Trans-Sulawesi) Elevated Transit Crossing UNESCO Global Karst Geopark -4.996111, 119.605278 (Rammang2 Stn)

5. Geodetic Extrema of the National Railway Network

Geodetically, the 158 verified coordinates demarcate the outer territorial frontiers of operational rail transit in Indonesia:

  • Westernmost Point on Java: Merak Station (Daop 1 Jakarta) at 105° 59' 57" E (105.999167° E) and -5.932222° S, directly integrated with the Merak Ferry Terminal to Sumatra.
  • Westernmost Point Nationally (Sumatra): Krueng Mane Station (Subdivre 1.1 Aceh) at 5.196944° N, 96.969722° E, anchoring the Cut Meutia pioneer rail line.
  • Easternmost Point Nationally: Ketapang Station (formerly Banyuwangi Baru, Daop 9 Jember) at 114° 23' 53" E (114.398056° E) and -8.146667° S, facing the Bali Strait ferry crossing to Gilimanuk.
  • Northernmost Point Nationally: Kutablang Station on Aceh's pioneer line at 5° 12' 36" N (5.210000° N), representing Indonesia's sole operational passenger railway segment located in the Northern Hemisphere.
  • Southernmost Point Nationally: Sumberpucung and Karangkates operational sidings in East Java (Daop 8 Surabaya) at -8° 09' 26" S (-8.157198° S).

6. Policy Implications for GAPEKA 2026 Intermodal Integration

The availability of this standardized 158-point spatial inventory provides crucial foundational data for national transport planning, multimodal fare integration, and real-time rail radar tracking. As GAPEKA 2026 solidifies transfers between Whoosh high-speed services, Jabodebek LRT, regional commuter rail, and intercity corridors, consistent geodetic coordinate standards prevent geofencing errors and optimize end-to-end passenger journey planning.

Frequently Asked Questions (FAQ) About Indonesia's Railway Infrastructure

1. What is the longest active railway tunnel in Indonesia?

Nationwide, the longest tunnel is KCIC Whoosh Tunnel 6 at 4,478 meters in Cikalongwetan, West Bandung. For conventional 1,067 mm gauge railways, the record is held by Sasaksaat Tunnel at 949 meters in Daop 2 Bandung.

2. Which station has the highest elevation on Indonesia's active rail network?

The highest operational station is Nagreg Station (NG) in Daop 2 Bandung at an elevation of +848 meters above sea level (-7.027065, 107.893175). In Sumatra, the highest active station is Kotapadang Station (KOP) in Bengkulu at +598 m ASL.

3. Why were the historic Notog, Kebasen, and Ijo tunnels retired?

The colonial single-track tunnels had narrow clearances that capped train speeds at 50–60 km/h. During the southern Java double-tracking program (2019–2020), the Ministry of Transportation constructed wide-bore twin-track tunnels permitting 120 km/h speeds. The historic tunnels are preserved as cultural heritage structures.

4. Where are the highest and longest railway bridges in Indonesia located?

The tallest railway bridge is New Cisomang Viaduct with piers towering 100 meters above the valley floor. The longest active railway bridge on Java is Cikubang Viaduct spanning 300 meters. Both structures are located in West Bandung Regency along the Purwakarta–Padalarang corridor (Daop 2).

5. What is the operational extent of the Trans-Sulawesi Railway as of late 2026?

As of late 2026, the Trans-Sulawesi Railway operates across 112 km from Mandai Station (Maros) to Palanro Station (Barru), serving 14 stations through the Rammang-Rammang UNESCO Global Geopark karst landscape.

Key Takeaways & Assistive Q&A
What is the longest active railway tunnel in Indonesia?
Nationwide, the longest tunnel is KCIC Whoosh Tunnel 6 at 4,478 meters in Cikalongwetan, West Bandung. For conventional 1,067 mm gauge railways, the record is held by Sasaksaat Tunnel at 949 meters in Daop 2 Bandung.
Which station has the highest elevation on Indonesia's active rail network?
The highest operational station is Nagreg Station (NG) in Daop 2 Bandung at an elevation of +848 meters above sea level. In Sumatra, the highest active station is Kotapadang Station (KOP) in Bengkulu at +598 m ASL.
Why were the historic Notog, Kebasen, and Ijo tunnels retired?
The colonial single-track tunnels had narrow clearances that capped train speeds at 50–60 km/h. During the southern Java double-tracking program (2019–2020), the Ministry of Transportation constructed wide-bore twin-track tunnels permitting 120 km/h speeds.
Where are the highest and longest railway bridges in Indonesia located?
The tallest railway bridge is New Cisomang Viaduct with piers towering 100 meters above the valley floor. The longest active railway bridge on Java is Cikubang Viaduct spanning 300 meters. Both structures are located in West Bandung Regency.
What is the operational extent of the Trans-Sulawesi Railway as of late 2026?
As of late 2026, the Trans-Sulawesi Railway operates across 112 km from Mandai Station (Maros) to Palanro Station (Barru), serving 14 stations through the Rammang-Rammang UNESCO Global Geopark karst landscape.

Related Dispatches

Cipeundeuy Station: Mountain Safety Engineering, Trowek Tragedy & Evolution
Infrastructure, Stations

Cipeundeuy Station: Mountain Safety Engineering, Trowek Tragedy & Evolution

Daop 4 Flood Losses Exceed Rp31 Billion: Assessing KAI Climate Financial Risks & Track Hardening
Infrastructure, Track

Daop 4 Flood Losses Exceed Rp31 Billion: Assessing KAI Climate Financial Risks & Track Hardening

Railway Bio-Engineering: Stabilizing Steep Embankments with 697,100 Vetiver Grass Clumps Across Indonesian Tracks
Infrastructure, Track

Railway Bio-Engineering: Stabilizing Steep Embankments with 697,100 Vetiver Grass Clumps Across Indonesian Tracks

alurail alurail
Copyright ©️ 2024-2026 alurail by alula Made with 💗 from Pejaten, ID
Copyright ©️ 2024-2026 alurail by alula
Made with 💗 from Pejaten, ID

Community & Photographers

  • alurail Pass PRO
  • Submit Photo
  • User Suite
  • Curated Feed
  • Community Feed

Platform & Legal

  • About Platform
  • Terms & Conditions
  • Privacy Policy
  • Open Source Notices
  • FAQ / Help Center
Pass PRO PRO Upload Photo Suite Gallery
About
Terms
Privacy
License
FAQ
© 2026 alurail. All rights reserved.
alurail

alurail Legal & Info

About alurail

<h2>About AluRail</h2>

<p class="lead">
AluRail (Aluline TGV) is a free web-based platform that visualizes railway operations and train travel schedules across Indonesia. The service is available through <a href="https://alurail.web.id" target="_blank">alurail.web.id</a> and <a href="https://alurail.web.id" target="_blank">alurail.web.id</a>, developed independently by <strong>Alula</strong>
(<a href="https://alula.web.id" target="_blank">alula.web.id</a>) for railway enthusiasts (railfans) and passengers seeking a more intuitive understanding of train movements and timetable operations.
</p>

<h3>How It Works</h3>

<p>
AluRail transforms official <strong>GAPEKA 2025</strong> (Indonesia Railway Timetable Graph) data into an interactive geospatial visualization. Every train journey is reconstructed from scheduled departure and arrival times, station sequences, railway topology, and routing calculations to estimate how trains would move across the network.
</p>

<p>
Unlike conventional timetable viewers, AluRail continuously simulates train movement using a custom railway physics engine. The simulation considers various operational parameters including route geometry, train acceleration, braking, cruising speed, station dwell times, operational constraints, and other physical assumptions to estimate each train's position throughout its journey.
</p>

<p>
Whenever available, the platform also supports <strong>Crowdsourced Live Tracking</strong>. Passengers currently travelling on board may voluntarily share their GPS location. These telemetry reports are validated using map-matching algorithms and compared against the predicted GAPEKA route before being displayed to other users.
</p>

<h3>The Technology Behind AluRail</h3>

<ul>
<li><strong>PostgreSQL (PostGIS):</strong> Serves as the core geospatial database storing railway infrastructure, stations, and spatial relationships.</li>

<li><strong>Custom Railway Routing Engine:</strong> Implements graph-based routing algorithms including Dijkstra and A* to calculate railway paths, station connectivity, and operational routes.</li>

<li><strong>Railway Physics Engine:</strong> Simulates train movement by modelling acceleration, deceleration, cruising behaviour, station stops, speed restrictions, and travel progression based on timetable data.</li>

<li><strong>Viterbi Map-Matching:</strong> Validates crowdsourced GPS telemetry by matching noisy GPS observations onto the most probable railway track, improving live tracking reliability.</li>

<li><strong>Leaflet.js & OpenRailwayMap:</strong> Provide interactive map rendering and railway visualization layers.</li>
</ul>

<h3>Supported Railway Services</h3>

<p>
AluRail supports visualization for various railway services operating across Indonesia, including passenger, commuter, urban transit, heritage, and freight operations. Depending on data availability, the platform currently supports:
</p>

<ul>
<li>Intercity Passenger Trains (KA Antar Kota)</li>
<li>Whoosh High-Speed Railway</li>
<li>Commuter Line</li>
<li>Feeder Train Services</li>
<li>Local Passenger Trains</li>
<li>Freight Operations (Container, Cargo, Tanker, Coal, Cement and other freight services)</li>
<li>LRT Jakarta</li>
<li>LRT Jabodebek</li>
<li>LRT South Sumatra (Palembang)</li>
<li>Jakarta MRT</li>
<li>Ambarawa Heritage Railway</li>
</ul>

<p>
Additional railway operators and future services may be introduced as more infrastructure and timetable data become available.
</p>

<h3>Platform Features</h3>

<p>
AluRail combines timetable simulation, geospatial analysis, and live community participation into a single railway visualization platform. Key features include:
</p>

<ul>

<li>
<strong>Follow Mode</strong><br>
Automatically follows a selected train throughout its journey while continuously updating its estimated or live position.
</li>

<li>
<strong>Live GPS Cast</strong><br>
Passengers may voluntarily broadcast GPS telemetry while travelling onboard, allowing supported trains to display verified live positions instead of purely simulated movement.
</li>

<li>
<strong>Spotting Mode</strong><br>
Allows railfans to discover trains approaching nearby stations or railway crossings, making it easier to plan photography and train spotting activities.
</li>

<li>
<strong>Enhanced Railway Physics</strong><br>
Movement simulation considers railway gradient, elevation profile, track curvature, acceleration, braking, traction performance, speed restrictions, and operational constraints to produce more realistic train behaviour.
</li>

<li>
<strong>Detailed Route Analytics</strong><br>
Provides interactive charts including route elevation, curvature, gradient between stations, speed profile, and operational characteristics throughout the journey.
</li>

<li>
<strong>Train Information</strong><br>
Displays operational information about each service including operator, train category, route, schedule, formation details, and other service information.
</li>

<li>
<strong>Rolling Stock Database</strong><br>
Provides information about locomotives, EMUs, DMUs, coaches, wagons, and other railway vehicles used by supported services.
</li>

<li>
<strong>Coach & Class Information</strong><br>
Displays available passenger classes together with reference illustrations where available to help passengers identify onboard accommodation.
</li>
<li>
<strong>Adaptive Train Rendering</strong><br>
Train visualization automatically adjusts according to the current map zoom level. Different rendering modes are used to maintain smooth performance while displaying thousands of simultaneously simulated trains.
</li>

<li>
<strong>Train Filtering</strong><br>
Filter trains by service category such as Intercity, Commuter, High-Speed, Metro, LRT, Freight, Heritage, and other supported railway services.
</li>

<li>
<strong>Regional Filtering</strong><br>
Display trains operating within selected operational regions (Daerah Operasi / DAOP and other railway operational divisions) for easier monitoring.
</li>

<li>
<strong>Points of Interest (POI)</strong><br>
Explore railway-related locations including train spotting locations, photography viewpoints, railway landmarks, bridges, tunnels, stations, and other notable locations along the railway network.
</li>

<li>
<strong>Depots & Maintenance Facilities</strong><br>
View railway maintenance facilities including rolling stock depots, locomotive depots, maintenance workshops (Balai Yasa), stabling yards, and other operational infrastructure.
</li>

</ul>

<div class="disclaimer-box">
<h4>Disclaimer</h4>

<p>
<strong>AluRail is primarily a timetable simulation platform.</strong>
Unless a train is actively sharing verified Live Tracking data, all train positions displayed on the map are computational estimations generated from published schedules and the platform's railway physics engine.
</p>

<p>
Although the simulation attempts to realistically reproduce railway operations, actual train movements may differ significantly due to dispatching decisions, signal aspects, operational priorities, temporary speed restrictions, maintenance work, weather conditions, delays, early departures, extraordinary operations, GPS inaccuracies, or many other real-world factors that cannot always be observed by the platform.
</p>

<p>
Even when Live Tracking is available, GPS accuracy depends on user participation, mobile device quality, satellite reception, and local environmental conditions. Therefore, displayed positions should always be considered informational rather than authoritative.
</p>

<p>
<strong>This service must not be used as an official operational reference</strong> for travel planning, ticketing decisions, passenger information, or railway operations. Always refer to official PT Kereta Api Indonesia (Persero) information channels for accurate operational updates.
</p>

<p>
AluRail / Aluline TGV is an independent community project and is not affiliated with, endorsed by, partnered with, or officially associated with PT Kereta Api Indonesia (Persero), OpenStreetMap, OpenRailwayMap, or any other referenced organizations.
</p>
</div>

<p class="footer-note">
Made with ❣️ from Pejaten, Indonesia.
</p>

Terms of Use

<section id="terms-en" class="lang-content">
<h2>Terms of Service</h2>
<p class="effective-date"><strong>Effective Date:</strong> January 1, 2025 (Updated for GAPEKA 2025)</p>

<h3>1. Acceptance of Terms</h3>
<p>By accessing AluRail through alurail.web.id, alurail.web.id, and related subdomains (collectively, the "Service"), you acknowledge that you have read, understood, and agreed to these Terms of Service. If you do not agree, you must discontinue use of the Service.</p>

<h3>2. Independent Service</h3>
<p>AluRail is an independent community project developed by Alula. It is not affiliated with, endorsed by, or operated by any railway operator, government agency, or transportation authority unless explicitly stated.</p>

<h3>3. Nature of the Service</h3>
<p>The Service provides train schedule visualization, estimated train positions, operational simulations, and crowdsourced location validation based on publicly available information, GAPEKA data, and algorithmic processing. Displayed information may differ from actual railway operations.</p>

<h3>4. No Operational Guarantee</h3>
<p>Train movements, schedules, platform assignments, delays, cancellations, dispatching decisions, and operational conditions may change without notice. The Service must not be considered an official operational information source.</p>

<h3>5. Crowdsourced Contributions</h3>
<p>Users may voluntarily contribute GPS telemetry while onboard trains. Submission of fake GPS data, manipulated locations, automated submissions, spam, or attempts to interfere with system accuracy is strictly prohibited.</p>

<h3>6. Acceptable Use</h3>
<p>You agree not to misuse the Service, interfere with its infrastructure, reverse engineer protected components, exploit security vulnerabilities, scrape excessive data, or use automated systems that negatively impact platform availability.</p>

<h3>7. Intellectual Property</h3>
<p>Unless otherwise stated, the Service, its software, interface, branding, and original content remain the intellectual property of their respective owners. Open-source components remain governed by their own licenses.</p>

<h3>8. Availability</h3>
<p>The Service may be modified, suspended, restricted, or discontinued at any time without prior notice.</p>

<h3>9. Disclaimer ("AS IS")</h3>
<p>THE SERVICE IS PROVIDED "AS IS" AND "AS AVAILABLE" WITHOUT WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, NON-INFRINGEMENT, ACCURACY, OR CONTINUOUS AVAILABILITY.</p>

<h3>10. Limitation of Liability</h3>
<p>To the fullest extent permitted by law, Alula shall not be liable for direct, indirect, incidental, consequential, special, or punitive damages arising from the use of or inability to use the Service, including travel decisions, delays, missed connections, financial loss, personal injury, or data loss.</p>

<h3>11. Changes to these Terms</h3>
<p>These Terms may be updated periodically. Continued use of the Service constitutes acceptance of the revised Terms.</p>

<h3>12. Contact</h3>
<p>Questions regarding these Terms may be directed through the official AluRail contact channels.</p>
</section>

<h3>Independent Service Disclaimer</h3>

<p>AluRail is an independent community-developed platform created by Alula for railway visualization, research, educational, and enthusiast purposes.</p>

<p>AluRail is <strong>not affiliated with, associated with, authorized by, endorsed by, sponsored by, supported by, maintained by, operated by, or officially connected with</strong> PT Kereta Api Indonesia (Persero), PT Kereta Commuter Indonesia, PT Kereta Api Logistik, PT Kereta Api Pariwisata, PT Kereta Cepat Indonesia China (Whoosh), MRT Jakarta, LRT Jabodebek, LRT Jakarta, LRT Sumatera Selatan (Palembang), their subsidiaries, affiliates, successors, government agencies, transportation authorities, or any other railway operators unless explicitly stated.</p>

<p>All company names, railway service names, station names, train names, logos, trademarks, service marks, brands, route names, and other intellectual property displayed within the Service remain the property of their respective owners and are used solely for identification, informational, interoperability, historical, mapping, educational, or descriptive purposes.</p>

<p>The visualization presented by the Service represents publicly available operational information, algorithmic estimations, historical references, and voluntary community contributions. It must not be interpreted as an official operational system, railway dispatching platform, passenger information system, or real-time control center operated by any railway company.</p>

Privacy Policy

<section id="privacy-en" class="lang-content">
<h2>Privacy Policy</h2>
<p class="effective-date"><strong>Last Updated:</strong> June 2026</p>

<h3>1. Privacy Commitment</h3>
<p>Your privacy is important to us. We collect only the information reasonably necessary to operate and improve the Service.</p>

<h3>2. GPS Collection</h3>
<p>Your GPS location is accessed only after you intentionally enable Live Tracking. Background location is never collected without your explicit action.</p>

<h3>3. Processing</h3>
<p>Submitted GPS telemetry is processed using routing algorithms including Viterbi matching against the railway network to validate train positions. Telemetry is not associated with your personal identity.</p>

<h3>4. Server Logs</h3>
<p>Standard server logs such as IP address, browser type, timestamps, and technical diagnostics may be collected for security, abuse prevention, troubleshooting, and performance monitoring.</p>

<h3>5. Data Retention</h3>
<p>Live telemetry is temporary and automatically expires after the associated trip ends unless longer retention is required for security investigations.</p>

<h3>6. Third Parties</h3>
<p>We do not sell or rent your GPS telemetry. Limited technical processing by infrastructure providers may occur solely for operating the Service.</p>

<h3>7. Security</h3>
<p>Reasonable technical and organizational safeguards are implemented, although no online system can guarantee absolute security.</p>

<h3>8. User Safety</h3>
<p>We discourage publicly sharing real-time GPS positions. Anonymous mode or pseudonyms are strongly recommended.</p>

<h3>9. Your Responsibility</h3>
<p>Use of Live GPS or spotting features is entirely voluntary and at your own risk.</p>
</section>

Open Source Notices

<section id="opensource-en" class="lang-content">
<h2>Open Source Notice</h2>
<p>AluRail is built upon numerous open-source technologies and open data projects. We sincerely thank the communities maintaining them.</p>
<ul>
<li><strong>PostgreSQL, PostGIS & pgRouting</strong> — Spatial database, GIS extension, and routing engine.</li>
<li><strong>OpenStreetMap & OpenRailwayMap</strong> — Railway infrastructure and mapping data under their respective licenses.</li>
<li><strong>Leaflet.js</strong> — Interactive mapping library.</li>
</ul>
<p>All trademarks, copyrights, and licenses belong to their respective owners. Use within AluRail does not imply endorsement by those projects.</p>
</section>

alurail for Android

Version 1.3.0 • APK (110 MB)

Download the official alurail app package for Android.

Download APK
Requires Android 8.0 (Oreo) or later
alurail Pass Prime GRATIS!
early access

alurail Pass Prime GRATIS!