alurail alurail
Home & Hub Live Journey Map Timetables Route Search Special Trains (KLB) Train Directory Fleet Database Station Directory Facilities & Depots Operating Areas Safety & Incidents Updates & News Photo Gallery alurail pass
User Suite
Map Home Timetables Fleet
alurail alurail
Hub / Home Directory & Insights
Live Journey Map Crowdsourced Live Journey
Timetables Train Schedules
Search Routes Direct & Transit Finder
Extraordinary Trains (EOT) Extraordinary Trains
Train Directory Master Train Fleet
Fleet Database Rolling Stock Info
Stations Facilities & Hubs
Facilities Depots & Workshops
Operating Areas Daop & Divre
Incidents & Safety (EOE) Historical Rail Incidents
Updates & News Railway Dispatches & Insights
Photo Gallery Curated Collection
alurail pass Supporter Perks
About alurail Platform Info & Vision
Sign In / Account
Back to Updates • GAPEKA 2026, PSO Services
Live Radar alurail Pass Submit Photo
Live Journey / Updates / GAPEKA 2026 PSO Trains Comprehensive Profile: Schedules, Fares, and Rp5.68 Trillion Subsidy Analysis
GAPEKA 2026 PSO Services 22 November 2026 • Updated 22 November 2026

GAPEKA 2026 PSO Trains Comprehensive Profile: Schedules, Fares, and Rp5.68 Trillion Subsidy Analysis

Complete analysis of all 13 Public Service Obligation (PSO) intercity trains across Java and Sumatra, local/pioneer services, and Commuter Line networks under GAPEKA 2026 effective December 1, 2026.
alurail Editorial Team
Staff Writer & Rail Researcher • 754 views
GAPEKA 2026 PSO Trains Comprehensive Profile: Schedules, Fares, and Rp5.68 Trillion Subsidy Analysis
Table of Contents
  1. 1. 1. Policy Framework, Subsidy Budget, and Scale of the 2026 PSO Ecosystem
  2. 2. 2. Operational Architecture: Time Efficiency vs. Safety Margin Paradox
  3. 3. 3. Master Summary of All 13 Intercity PSO Trains in GAPEKA 2026
  4. 4. 4. Detailed Profiles & Station Schedules: All 9 Java Intercity PSO Trains
  5. 5. 5. Evolution of PSO Policy & The 2026 Cabin Revolution
  6. 6. 6. Sumatra Intercity PSO & Local / Pioneer / Commuter Line Networks
  7. 7. 7. Detailed GAPEKA 2026 Commuter Line, Local & Sumatra Schedules
  8. 8. 8. Strategic Implications & Practical Passenger Guide Post-December 1, 2026
Executive Summary — GAPEKA 2026 PSO Network

The implementation of Indonesia's 2026 Train Travel Chart (GAPEKA 2026) effective December 1, 2026 at 00:00 WIB under Ministerial Decrees KP-DJKA 116–119 of 2026 preserves all 13 subsidized Public Service Obligation (PSO) intercity trains—9 across Java and 4 across Sumatra—with zero fare increases under Ministerial Decree KM 165 of 2024.

Backed by a 2026 State Budget (APBN) PSO allocation of Rp5,684,206,808,000 (Presidential Regulation No. 118/2025) plus Rp1.8 trillion in State Capital Participation (PMN), GAPEKA 2026 cuts travel time on KA 307 Kahuripan by 92 minutes and KA Airlangga by over 50 minutes in both directions, opens full boarding/alighting for KA Serayu at Bandung Station (Hall), extends KA Kedung Sepur to Weleri and CL Prameks to Kebumen, and doubles KA Batara Kresna frequency to 8 daily trips.

2026 APBN PSO Budget
Rp5.68 Trillion
Rp5,684,206,808,000 (Perpres 118/2025)
Intercity PSO Services
13 Services
9 on Java · 4 on Sumatra
Largest Time Reduction
−92 Minutes
KA 307 Kahuripan (Blitar–Kiaracondong)
2025 PSO Ridership
452.66 Million
88.53% carried by KAI Commuter

Beneath the official headline of 92-minute time savings, a segment-level inspection of the KP-DJKA 116–119 of 2026 timetable appendices reveals a far more nuanced operational reality. Lowering Java's main-line maximum operational speed from 120 km/h to 115 km/h, inserting safety recovery and buffer times, and adding new station stops across Daop 3 Cirebon, Daop 5 Purwokerto, and Daop 9 Jember produce an asymmetric impact. While specific corridors enjoy dramatic acceleration, several return PSO services actually slow down by 11 to 24 minutes—including KA 329 Tawang Alun (+24m), KA 313 Sri Tanjung (+22m), KA 316 Bengawan (+19m), and KA 322 Serayu (+16m)—while KA 315 Bengawan's morning arrival at Pasar Senen shifts to 08:20 WIB, raising concern among Monday morning commuters.

1. Policy Framework, Subsidy Budget, and Scale of the 2026 PSO Ecosystem

The legal foundation for Indonesia's rail network starting December 1, 2026 rests on four Directorate General of Railways (DJKA) decrees: KP-DJKA 116/2026 for Java (9 Operations Regions / Daop 1–9), KP-DJKA 117/2026 for North Sumatra (Sumbagut), KP-DJKA 118/2026 for West Sumatra (Sumbagbar), and KP-DJKA 119/2026 for South Sumatra (Sumbagsel). On the fiscal side, Presidential Regulation No. 118/2025 allocates Rp5,684,206,808,000 (approx. Rp5.68 trillion) for 2026 economy-class rail PSO subsidies, complemented by Rp1.8 trillion in State Capital Participation (PMN) approved by House Commission XI in December 2025 for Jabodetabek EMU procurement/retrofits, passenger service upgrades, and infrastructure modernization (a combined Rp7.484 trillion across both itemized allocations, often rounded to Rp7.6 trillion in financial press).

Passenger fares remain locked under Ministerial Decree KM 165 of 2024. Although regional communications occasionally cite PM 21 of 2020 alongside KM 165/2024, the Supreme Audit Agency (BPK) JDIH database confirms that PM 21/2020 was formally revoked by PM 90/2020 on December 29, 2020, leaving KM 165/2024 as the sole active tariff instrument. To safeguard the Rp5.68 trillion subsidy, DJKA, regional Railway Engineering Centers (BTP), and PT KAI enforce two primary controls: a strict one-ID-one-ticket rule (blocking duplicate bookings under the same national ID) and quarterly field audits (verified across Q1–Q3 2026 in Divre III Palembang) covering ridership accuracy, train-kilometers, maintenance realization, fumigation/pest control, sanitation, and station/onboard service standards.

The scale of state intervention is illustrated by the Pandanwangi local PSO train (Jember–Ketapang, 112 km): passengers pay Rp8,000 (Rp71.4/km) against a 2024 operator service-cost baseline of Rp33,421—meaning the government absorbs a Rp25,421 per-passenger gap (76.1%). Across all subsidized categories in full-year 2025, KAI Group carried 452,655,503 passengers: 400,737,915 (88.53%) on KAI Commuter, 28,816,787 (6.37%) on LRT Jabodebek, 11,418,824 (2.52%) on Intercity PSO trains (+2.56% YoY), 6,225,944 (1.38%) on Local PSO trains (+15.83% YoY), and 5,456,033 (1.21%) on PSO Airport Rail (Srilelawangsa & YIA, +16.88% YoY). Dividing the Rp5.684 trillion 2026 PSO ceiling by 2025 volume yields a proxy subsidy of Rp12,557 per trip. Despite representing only 2.52% of ridership, intercity PSO trains dominated early 2026/2027 Year-End Holiday (Nataru) bookings as of November 11, 2026, sweeping the top four spots—led by KA Bengawan, KA Airlangga (17,841 tickets), KA Kahuripan (13,365), and KA Serayu (13,286)—more than doubling top commercial trains like KA Progo (6,310).

2025 PSO Ridership Share & 2026 Intercity Effective Fare per Kilometer
Distribution of 452.66 million subsidized trips (left) and effective Rp/km across Sumatra vs. Java (right)
A. 2025 PSO Ridership (452.66M Total) KAI Commuter (400.74M) 88.53% LRT Jabodebek (28.82M) 6.37% Intercity PSO (11.42M) 2.52% Local PSO (6.23M) 1.38% Airport PSO (5.46M) 1.21% B. Effective Fare per km (KM 165/2024) Ekspres Rajabasa (389 km) Rp82.3/km Bukit Serelo (304.9 km) Rp105.0/km Kahuripan (700 km) Rp120.0/km Bengawan (567 km) Rp130.5/km Airlangga (719 km) Rp144.6/km Cikuray (245 km) Rp183.7 Tawang Alun (314 km) Rp197.5

2. Operational Architecture: Time Efficiency vs. Safety Margin Paradox

Nationally, GAPEKA 2026 raises scheduled daily seat capacity by 5.03% (from 168,316 to 176,782 seats/day, +8,466 seats) and daily passenger trips from 1,813 to 1,852 (+39 trips). Java intercity capacity grows +3.89% to 137,846 seats/day (78.0% of national total), while Sumatra rises +9.26% to 38,936 seats/day (17,648 intercity and 20,176 urban). Across the main Java trunk lines, PT KAI reduced maximum operational speed from 120 km/h to 115 km/h and inserted recovery/buffer times—slowing flagship executive trains like Argo Lawu, Argo Dwipangga, and Taksaka by 17 minutes, while allowing 90–100 km/h PSO trains to gain efficiency. Meanwhile, Daop 9 Jember (Tapal Kuda) received infrastructure speed upgrades: Kalisat–Jember (90 km/h), Jember–Tanggul (120 km/h), Tanggul–Jatiroto (110 km/h), and Pasuruan–Bangil (110 km/h).

GAPEKA 2026 also adds stops across 84 intercity trips—including mandatory Bekasi stops on many long-distance trains, Jeruklegi for Kahuripan, Ciledug and Sumpiuh for Bengawan, Rancaekek for Cikuray, full Bandung (Hall) boarding/alighting for Serayu, and three new stops for Pandanwangi—while renaming Klakah Station to Lumajang (LMJ). Following a brief 48-hour controversy on November 1–2, 2026 when a commercial train name consolidation briefly appeared in ticketing systems before being rolled back, all 13 intercity PSO trains remain intact, with Java PSO train numbers reindexed from 271–300 to 305–334. Three scheduling dynamics explain the divergent outcomes: (1) double-track symmetry on the North Coast (Airlangga −52m/−51m), (2) slot shifting (moving Kahuripan's Blitar departure 2.5 hours later to 19:40 eliminated 78 minutes of dwell across Kertosono–Caruban–Walikukun–Klaten), and (3) single-track trade-offs in Priangan and Tapal Kuda where added regular services (Pandalungan 2 and Sangkuriang) force opposing-meet waits (+16m to +24m).

Asymmetric Impact of GAPEKA 2026: Travel Time Deltas Across Intercity PSO Trains (Minutes)
Time savings (green, left) vs. added crossing/dwell time (crimson, right) compared to GAPEKA 2025
0 min (GAPEKA 2025 Baseline) KA 307 Kahuripan (BL–KAC) −92m KA 305 Airlangga (SBI–PSE) −52m KA 306 Airlangga (PSE–SBI) −51m KA 318/319 Serayu (PSE–PWT) −31m KA 331 Probowangi (SGU–KTG) −12m KA U96 Putri Deli (MDN–TNB) −8m KA 334 Cikuray (PSE–GRT) −7m KA 315 Bengawan (PWS–PSE) −4m KA 332 Probowangi (KTG–SGU) +11m KA 314 Sri Tanjung (KTG–SB) +13m KA 322 Serayu (PSE–KYA) +16m KA 316 Bengawan (PSE–PWS) +19m KA 313 Sri Tanjung & KA 329 Tawang Alun +22m / +24m

3. Master Summary of All 13 Intercity PSO Trains in GAPEKA 2026

The master table below consolidates all 13 subsidized intercity trains across Java and Sumatra, including commercial average speeds (distance divided by average end-to-end duration including locomotive run-around) and effective fare per kilometer.

No Train Name (Region) 2026 Nos. (2025) Route 2026 Schedule (WIB) Duration (Delta) Dist. (km) Avg. Speed Full Fare (Partial) Fare/km Rolling Stock
1KA Airlangga (Java / Daop 8)305 (271A) / 306 (272B)SBI–PSE PP12:30–23:46 / 08:35–20:2211h 16m (−52m) / 11h 47m (−51m)71962.4 km/hRp104,000 (Rp49k–104k)Rp144.68 K3 AC (106 seats, 3–2)
2KA Kahuripan (Java / Daop 2)307 (273) / 308 (274)BL–KAC PP19:40–08:13 / 22:15–12:0012h 33m (−92m) / 13h 45m (±0m)70053.2 km/hRp84,000 (Rp80k–84k)Rp120.0K3 AC (106 seats, 3–2)
3KA Sri Tanjung (Java / Daop 9)312/313 & 314/311LPN–SB–KTG PP06:50–19:55 / 07:00–19:2613h 05m (+5m) / 12h 26m62048.6 km/hRp94,000 (Rp88k–94k)Rp151.67 K3 AC (106) + KMP3 + B
4KA Bengawan (Java / Daop 6)315 (281) / 316 (282)PWS–PSE PP23:35–08:20 / 09:15–18:448h 45m (−4m) / 9h 29m (+19m)56762.2 km/hRp74,000Rp130.5K3 AC (106 seats, 3–2)
5KA Serayu (Java / Daop 5, 2x PP)317–324PWT–KYA–BD–PSE PP06:30, 10:00, 16:45, 19:05318/319: −31m; 321: −3m; 322: +16m44240.8 km/hRp67,000 (Rp63k–67k)Rp151.6K3 AC (106 seats, 3–2)
6KA Kutojaya Selatan (Daop 5)325 (291A) / 326 (292)KTA–KAC PP09:35–17:07 / 20:50–04:077h 32m (−3m) / 7h 17m (+2m)31943.1 km/hRp62,000 (Rp58k–62k)Rp194.47 K3 AC (106) + KMP3
7KA Tawang Alun (Daop 9)330/327 & 328/329KTG–BG–MLK PP05:00–12:08 / 16:30–23:597h 08m (−1m) / 7h 29m (+24m)31443.0 km/hRp62,000Rp197.55 K3 AC (106) + KMP3
8KA Probowangi (Daop 9)331 (297) / 332 (298A)SGU–KTG PP05:20–11:58 / 17:10–23:566h 38m (−12m) / 6h 46m (+11m)30645.7 km/hRp56,000 (Rp27k–56k)Rp183.06 K3 AC (106) + KMP3 + B
9KA Cikuray (Daop 2)333 / 334 (300A)GRT–PSE PP06:35–12:17 / 17:30–22:555h 42m / 5h 25m (−7m)24544.1 km/hRp45,000 (Special: Rp15k)Rp183.76 Eko Kerakyatan (93) + 1 Farmer-Trader (73) + MP
10KA Ekspres Rajabasa (Divre IV)S7 / S8KPT–TNK PP08:30–18:15 / 08:30–18:009h 45m / 9h 30m38940.4 km/hRp32,000 (Partial: Rp29k)Rp82.38 Eko Premium Mod (80, 2–2) + M1/MP2 + P
11KA Bukit Serelo (Divre III)S9 / S10KPT–LLG PP09:00–15:40 / 10:15–16:556h 40m / 6h 40m304.945.7 km/hRp32,000Rp105.0K3 AC (3–2) + KMP3
12KA Kuala Stabas (Divre IV, 2x PP)S3, S5 / S4, S6BTA–TNK PP06:30, 14:00 / 06:30, 13:305h 40–45m / 5h 20–25m21538.8 km/hRp29,000Rp134.95 Eko Premium (80, 2–2) + 1 K1 Staff + MP3
13KA Putri Deli (Divre I, 3x PP)U95–U100MDN–TNB PPMDN: 07:15, 14:10, 19:004h 00m–4h 18m (5 of 6 faster)17542.3 km/hRp27,000Rp154.36 K3 AC (3–2) + P

Two structural patterns stand out from this quantitative mapping. First, effective fares per kilometer diverge sharply between Southern Sumatra and Java: KA Ekspres Rajabasa passengers pay only Rp82.3/km while riding 80-seat reclining Economy Premium Modified coaches, less than half the per-kilometer rate of KA Tawang Alun (Rp197.5/km) or KA Kutojaya Selatan (Rp194.4/km) which still use 106-seat upright facing benches. Second, double-track infrastructure and locomotive run-around requirements dictate commercial speeds: the three fastest PSO trains—Airlangga (62.4 km/h), Bengawan (62.2 km/h), and Kahuripan (53.2 km/h)—all exploit long double-track corridors, whereas trains requiring locomotive reversals (Sri Tanjung 45m at Surabaya Kota, Tawang Alun 34–40m at Bangil, Serayu 20–33m at Kroya) or traversing Priangan mountain grades and Sumbagsel single-track meets average 38.8–48.6 km/h.

4. Detailed Profiles & Station Schedules: All 9 Java Intercity PSO Trains

KA Airlangga (KA 305 & KA 306)

Launched on October 1, 2021 at Pasar Senen as the successor to KA Maharani and KA Tegal Ekspres, KA Airlangga (named after King Airlangga of the 11th-century Kahuripan Kingdom) operates under Daop 8 Surabaya with 8 K3 AC coaches (106 seats 3–2) hauled by CC 201/CC 203 locomotives. Covering 719 km at Rp49,000–Rp104,000, it is Indonesia's busiest intercity PSO train with 1,102,509 passengers in January–October 2026. Under GAPEKA 2026, KA 305 (SBI–PSE) cuts 52 minutes (11h 16m) and KA 306 (PSE–SBI) cuts 51 minutes (11h 47m), aided by 100 km/h limits along the double-track North Coast.

Station KA 305 (SBI → PSE) KA 306 (PSE → SBI)
Surabaya Pasarturi (SBI) → Lamongan → Babat → Bojonegoro → Cepu12:30 / 13:03 / 13:29 / 13:59 / 14:2920:22 / 19:44 / 19:17 / 18:46 / 18:14
Randublatung → Ngrombo → Semarang Poncol (SMC) → Weleri14:53 / 15:40 / 16:30–16:36 / 17:0817:51 / 17:04 / 16:10–16:15 / 15:36
Batang → Pekalongan → Pemalang → Tegal → Brebes17:39 / 17:52 / 18:21–18:44 (23m) / 19:08 / 19:2214:46–15:05 (19m) / 14:33 / 14:06 / 13:38 / 13:25
Tanjung → Babakan → Cirebon Prujakan (CNP) → Arjawinangun19:40 / 19:56 / 20:17–20:22 / 20:4113:06 / 12:48 / 12:10–12:28 (18m) / 11:50
Jatibarang → Haurgeulis → Pegaden Baru → Cikampek → Cikarang → Bekasi → Jatinegara → Pasar Senen (PSE)21:03 / 21:39 / 21:54 / 22:27 / 23:00 / 23:19 / 23:34 / 23:4611:19–11:31 (12m) / 10:44 / 10:30 / 09:47–10:00 (13m) / 09:15 / 08:56 / Pass 08:45 / 08:35

KA Kahuripan (KA 307 & KA 308)

Operating since July 26, 1995, KA Kahuripan (Blitar–Kiaracondong PP, 700 km, Rp80,000–Rp84,000, 681,208 passengers in Jan–Oct 2026) is managed by Daop 2 Bandung using K3 AC coaches hauled predominantly by CC 203 locomotives (97%). Its historical record includes the October 25, 1995 Trowek derailment (coupled with KA Galuh), a December 5, 2001 shunting collision at Palur, and a September 13, 2022 truck collision near Kawunganten. In GAPEKA 2026, shifting KA 307's Blitar departure 2.5 hours later (17:10 to 19:40 WIB, arriving Kiaracondong 08:13) shrinks combined dwell at Kertosono, Caruban, Walikukun, and Klaten from 87 minutes to 9 minutes and bypasses Sikampuh—delivering a net 92-minute reduction (14h 05m to 12h 33m). Eastbound KA 308 (KAC 22:15 → BL 12:00, 13h 45m) adds a new stop at Jeruklegi (JRL) (03:15–03:25).

KA Sri Tanjung (KA 311, 312, 313, & 314)

In service since 1986 (originally KA Argopuro, renamed in the mid-1990s after the Banyuwangi legend), KA Sri Tanjung connects Lempuyangan and Ketapang (620 km, Rp88,000–Rp94,000) under Daop 9 Jember with 7 K3 AC coaches + 1 KMP3 + 1 baggage car, reversing locomotives at Surabaya Kota (SB). Under GAPEKA 2026, KA 312 (LPN 06:50 → SB 12:08, 5h 18m, −12m) and a trimmed 45-minute SB turnaround offset a 22-minute slowdown on KA 313 (SB 12:53 → KTG 19:55, 7h 02m) for a 13h 05m total (+5m). Return KA 314 (KTG 07:00 → SB 13:28, +13m) + KA 311 (SB 14:13 → LPN 19:26) takes 12h 26m. Klakah Station is now officially Lumajang (LMJ).

KA Bengawan (KA 315 & KA 316)

Launched around 1994 under Daop 6 Yogyakarta (567 km, Purwosari–Pasar Senen PP, Rp74,000, 666,106 passengers in Jan–Oct 2026, #1 in early Nataru 2026/2027 bookings), KA Bengawan shares K3 AC sets with KA Matarmaja. In GAPEKA 2026, KA 315 (PWS 23:35 → PSE 08:20, 8h 45m, −4m, fastest one-way PSO train at 64.8 km/h) shifts arrival 46 minutes later from 07:34 to 08:20 WIB, troubling office commuters. KA 316 (PSE 09:15 → PWS 18:44, 9h 29m) slows by 19 minutes due to new stops at Ciledug (also served by KA 315) and Sumpiuh (15-minute dwell).

KA Serayu (KA 317–324, 2x PP)

Tracing its roots to KA Serayu Jaya (1992), KA Cipuja, and KA Citrajaya before its 1998 revival during the Asian Financial Crisis, KA Serayu (Purwokerto–Kroya–Bandung–Pasar Senen PP, 442 km, Rp63,000–Rp67,000, 1,047,130 passengers in Jan–Oct 2026, #2 nationally) achieves a major milestone on December 1, 2026: all morning and night trips now allow both boarding and alighting at Bandung Station (BD). Morning KA 318/319 (PSE 10:00 → PWT 20:34) accelerates by 31 minutes, KA 321 (KYA 17:30 → PSE 04:14) saves 3 minutes, while KA 322 (PSE 19:05 → KYA 05:11) adds 16 minutes due to a 23-minute technical stop at Cipeundeuy.

KA Kutojaya Selatan, KA Tawang Alun, KA Probowangi, & KA Cikuray

  • KA Kutojaya Selatan (KA 325/326 | Kutoarjo–Kiaracondong PP, 319 km, Rp58k–62k): KA 325 (09:35–17:07, 7h 32m, −3m); KA 326 (20:50–04:07, 7h 17m, +2m).
  • KA Tawang Alun (KA 327–330 | Ketapang–Bangil–Malang Kotalama PP, 314 km, Rp62k): Reverses at Bangil; KA 330/327 (05:00–12:08, 7h 08m); KA 328/329 (16:30–23:59, 7h 29m, +24m on BG–KTG due to crossing dwells).
  • KA Probowangi (KA 331/332 | Surabaya Gubeng–Ketapang PP, 306 km, Rp27k–56k, 597,015 passengers): KA 331 (05:20–11:58, 6h 38m, −12m); KA 332 (17:10–23:56, 6h 46m, +11m).
  • KA Cikuray (KA 333/334 | Pasar Senen–Garut PP, 245 km, Rp45k / Rp15k special, 477,310 passengers): Since June 10, 2026, pioneers 6 Ekonomi Kerakyatan coaches (93 rotating seats) + 1 Farmer-Trader coach (73 longitudinal seats). Adds stops at Rancaekek (RCK); KA 334 (17:30–22:55, −7m) and KA 333 (06:35–12:17).

5. Evolution of PSO Policy & The 2026 Cabin Revolution

Three policy milestones shaped the 2026 PSO landscape: (1) the July 1, 2018 partial-fare reform replacing flat end-to-end pricing with distance zones; (2) the January 1, 2019 subsidy rationalization removing PSO from five long-distance trains (Matarmaja, Brantas, Pasundan, Logawa, etc.) to redirect funding toward commuters; and (3) the mid-2026 PSO cabin revolution introducing 93-seat Ekonomi Kerakyatan and 73-seat Farmer-Trader coaches on KA Cikuray (June 10, 2026) and 80-seat reclining Ekonomi Premium Modified coaches on KA Ekspres Rajabasa (July 4, 2026) at zero fare increase—structurally raising per-seat subsidy requirements under the Rp5.68 trillion APBN ceiling as coach capacity drops 12.3%–24.5%.

6. Sumatra Intercity PSO & Local / Pioneer / Commuter Line Networks

Sumatra's four intercity PSO services gain +444 daily seats (to 17,648 seats/day): KA Ekspres Rajabasa (S7/S8, Kertapati–Tanjungkarang, 389 km, Rp32,000, now 80-seat Ekonomi Premium Modified); KA Bukit Serelo (S9/S10, Kertapati–Lubuklinggau, 304.9 km, Rp32,000, 6h 40m both ways); KA Kuala Stabas (S3–S6, Baturaja–Tanjungkarang, 2x PP, 215 km, Rp29,000); and KA Putri Deli (U95–U100, Medan–Tanjungbalai, 3x PP, 175 km, Rp27,000, 5 of 6 trips faster by 2–8 minutes).

Across local, pioneer, and commuter services (97.48% of all 2025 PSO riders): KA Pandanwangi (KA 507–510, Rp8,000) adds Glenmore, Sumberwadung, and Argopuro (11 stops, +6–29m); KA Siliwangi (KA 351–356, Rp2,000–5,000) runs 3x PP in 2h 15m; KA Kedung Sepur (KA 511–514) extends to Weleri; KA Batara Kresna (KA 527–534, Rp4,000) doubles to 8 daily trips; Sumatra local/airport trains add trips on Sri Lelawangsa (+4) and Datuk Belambangan (+1) alongside Siantar Ekspres and Pariaman Ekspres; KRL Jabodetabek rises to 1,079 daily trips (86 trainsets including 7 INKA iE305 sets); and Commuter Line Prameks extends 2 of its 10 daily trips to Kebumen (KA 522 at 04:55→06:28 and KA 521 at 19:23→21:00).

7. Detailed GAPEKA 2026 Commuter Line, Local & Sumatra Schedules

To support regional commuters and intercity transfers, GAPEKA 2026 introduces major timetable updates across KAI Commuter's regional areas and PT KAI's Sumatra divisions:

Train No. (CL Prameks) Route Kebumen Kutowinangun Kutoarjo Jenar Wojo Wates Yogyakarta
KA 522 (New)KBM → YK04:5505:0705:2805:4105:5006:0306:28
KA 515 / KA 516YK ↔ KTA——07:42 / 08:3007:30 / 08:4307:20 / 08:5207:07 / 09:0506:40 / 09:30
KA 517 / KA 518YK ↔ KTA——11:31 / 13:1511:19 / 13:2811:09 / 13:3710:42 / 13:5010:16 / 14:15
KA 519 / KA 520YK ↔ KTA——16:00 / 17:0415:48 / 17:1715:38 / 17:2615:25 / 17:4015:00 / 18:05
KA 523 / KA 524YK ↔ KTA——17:58 / 18:5617:46 / 19:0917:36 / 19:1817:23 / 19:3116:55 / 19:56
KA 521 (New)YK → KBM21:0020:5120:3220:1320:0319:5019:23

In Central Java, KA Kedung Sepur extends to Weleri (13 stops, Vmax 90 km/h, bypassing Tegowanu) with four daily runs: KA 512 (Weleri 06:00–Ngrombo 08:50), KA 511 (Ngrombo 10:40–Weleri 13:38), KA 514 (Weleri 14:55–Ngrombo 18:16), and KA 513 (Ngrombo 19:20–Weleri 22:06). Meanwhile, the pioneer KA Batara Kresna (Purwosari–Wonogiri, 37 km, Rp4,000, supported by DJKA Pioneer Subsidy) doubles from 4 to 8 daily 1-hour trips (departing Purwosari at 06:00, 09:00, 13:30, 16:30 and Wonogiri at 07:30, 10:30, 15:00, 18:00). In West Java, KA Siliwangi (Sukabumi–Cianjur–Cipatat, 67 km, Rp2,000–5,000) renumbers to KA 351–356 (3x PP, 2h 15m each). In Sumatra, KA Siantar Ekspres (U101–U104, Medan–Siantar, 129 km, 4 trips), KA Sri Lelawangsa (+4 trips, Kuala Bingai–Medan Rp5,000), KA Datuk Belambangan (+1 trip, Tebing Tinggi–Lalang Rp5,000), and KA Pariaman Ekspres (B1–B10, Pauhlima–Padang–Naras, 10 trips, Rp5,000, equipped with bicycle-friendly K3 AC + KMP3) expand urban mobility.

8. Strategic Implications & Practical Passenger Guide Post-December 1, 2026

  1. Re-verify pre-booked departure times: Major shifts include KA 307 Kahuripan (+2h 30m later to 19:40), KA 315 Bengawan (+50m later to 23:35), KA 306 Airlangga (40m earlier to 08:35), and KA 331 Probowangi (35m earlier to 05:20).
  2. Use newly opened stations: Board/alight KA Serayu at Bandung (Hall), KA Cikuray at Rancaekek, KA Kahuripan at Jeruklegi, KA Bengawan at Ciledug/Sumpiuh, and CL Prameks at Kebumen.
  3. Search for Lumajang (LMJ) instead of Klakah: Klakah Station is officially renamed Lumajang in GAPEKA 2026.
  4. Book at H-45 with accurate single ID: Duplicate ID bookings on the same PSO departure are automatically rejected.
  5. Combine go-show & local PSO fares: Use KA Cikuray's Rp15,000 H-2 hour special fare or pair CL Bandung Raya (Rp5,000) with KA Siliwangi (Rp2,000–5,000).
Key Takeaways & Assistive Q&A
Do PSO train fares increase under GAPEKA 2026?
No. All subsidized economy PSO fares remain unchanged under Ministerial Decree KM 165 of 2024, supported by the Rp5.68 trillion 2026 APBN PSO budget.
Which PSO train sees the largest travel time reduction in GAPEKA 2026?
KA 307 Kahuripan (Blitar–Kiaracondong) cuts travel time by 92 minutes to 12 hours 33 minutes, followed by KA 305 Airlangga (−52 minutes) and KA 306 Airlangga (−51 minutes).
Why are some return PSO trains slower in GAPEKA 2026?
Lowering Java's main-line maximum speed from 120 to 115 km/h, adding buffer times, introducing new stops, and single-track crossing waits in Priangan and Tapal Kuda add 11–24 minutes on KA 329 Tawang Alun, KA 313 Sri Tanjung, KA 316 Bengawan, and KA 322 Serayu.
Can KA Serayu passengers now board at Bandung Station?
Yes. Starting December 1, 2026, all morning and night KA Serayu services allow both boarding and alighting at Bandung Station (BD / Hall).
Which PSO trains received upgraded passenger coaches in 2026?
KA Cikuray introduced 93-seat rotating Ekonomi Kerakyatan coaches and a 73-seat Farmer-Trader coach on June 10, 2026, while KA Ekspres Rajabasa upgraded to 80-seat reclining Ekonomi Premium Modified coaches on July 4, 2026.

Related Dispatches

History and Consolidation of KA Muria in GAPEKA 2026: From Trio Argo Semarangan to the 115 km/h Era
History, GAPEKA 2026

History and Consolidation of KA Muria in GAPEKA 2026: From Trio Argo Semarangan to the 115 km/h Era

Surabaya Regional Railway Line Project: SF8 EMU Agreement, Sidotopo Depot, and In-Depth 2030 Timeline Analysis
Commuter Rail, Projects

Surabaya Regional Railway Line Project: SF8 EMU Agreement, Sidotopo Depot, and In-Depth 2030 Timeline Analysis

Cipeundeuy Station: Mountain Safety Engineering, Trowek Tragedy & Evolution
Infrastructure, Stations

Cipeundeuy Station: Mountain Safety Engineering, Trowek Tragedy & Evolution

alurail alurail
Copyright ©️ 2024-2026 alurail by alula Made with 💗 from Pejaten, ID
Copyright ©️ 2024-2026 alurail by alula
Made with 💗 from Pejaten, ID

Community & Photographers

  • alurail Pass PRO
  • Submit Photo
  • User Suite
  • Curated Feed
  • Community Feed

Platform & Legal

  • About Platform
  • Terms & Conditions
  • Privacy Policy
  • Open Source Notices
  • FAQ / Help Center
Pass PRO PRO Upload Photo Suite Gallery
About
Terms
Privacy
License
FAQ
© 2026 alurail. All rights reserved.
alurail

alurail Legal & Info

About alurail

<h2>About AluRail</h2>

<p class="lead">
AluRail (Aluline TGV) is a free web-based platform that visualizes railway operations and train travel schedules across Indonesia. The service is available through <a href="https://alurail.web.id" target="_blank">alurail.web.id</a> and <a href="https://alurail.web.id" target="_blank">alurail.web.id</a>, developed independently by <strong>Alula</strong>
(<a href="https://alula.web.id" target="_blank">alula.web.id</a>) for railway enthusiasts (railfans) and passengers seeking a more intuitive understanding of train movements and timetable operations.
</p>

<h3>How It Works</h3>

<p>
AluRail transforms official <strong>GAPEKA 2025</strong> (Indonesia Railway Timetable Graph) data into an interactive geospatial visualization. Every train journey is reconstructed from scheduled departure and arrival times, station sequences, railway topology, and routing calculations to estimate how trains would move across the network.
</p>

<p>
Unlike conventional timetable viewers, AluRail continuously simulates train movement using a custom railway physics engine. The simulation considers various operational parameters including route geometry, train acceleration, braking, cruising speed, station dwell times, operational constraints, and other physical assumptions to estimate each train's position throughout its journey.
</p>

<p>
Whenever available, the platform also supports <strong>Crowdsourced Live Tracking</strong>. Passengers currently travelling on board may voluntarily share their GPS location. These telemetry reports are validated using map-matching algorithms and compared against the predicted GAPEKA route before being displayed to other users.
</p>

<h3>The Technology Behind AluRail</h3>

<ul>
<li><strong>PostgreSQL (PostGIS):</strong> Serves as the core geospatial database storing railway infrastructure, stations, and spatial relationships.</li>

<li><strong>Custom Railway Routing Engine:</strong> Implements graph-based routing algorithms including Dijkstra and A* to calculate railway paths, station connectivity, and operational routes.</li>

<li><strong>Railway Physics Engine:</strong> Simulates train movement by modelling acceleration, deceleration, cruising behaviour, station stops, speed restrictions, and travel progression based on timetable data.</li>

<li><strong>Viterbi Map-Matching:</strong> Validates crowdsourced GPS telemetry by matching noisy GPS observations onto the most probable railway track, improving live tracking reliability.</li>

<li><strong>Leaflet.js & OpenRailwayMap:</strong> Provide interactive map rendering and railway visualization layers.</li>
</ul>

<h3>Supported Railway Services</h3>

<p>
AluRail supports visualization for various railway services operating across Indonesia, including passenger, commuter, urban transit, heritage, and freight operations. Depending on data availability, the platform currently supports:
</p>

<ul>
<li>Intercity Passenger Trains (KA Antar Kota)</li>
<li>Whoosh High-Speed Railway</li>
<li>Commuter Line</li>
<li>Feeder Train Services</li>
<li>Local Passenger Trains</li>
<li>Freight Operations (Container, Cargo, Tanker, Coal, Cement and other freight services)</li>
<li>LRT Jakarta</li>
<li>LRT Jabodebek</li>
<li>LRT South Sumatra (Palembang)</li>
<li>Jakarta MRT</li>
<li>Ambarawa Heritage Railway</li>
</ul>

<p>
Additional railway operators and future services may be introduced as more infrastructure and timetable data become available.
</p>

<h3>Platform Features</h3>

<p>
AluRail combines timetable simulation, geospatial analysis, and live community participation into a single railway visualization platform. Key features include:
</p>

<ul>

<li>
<strong>Follow Mode</strong><br>
Automatically follows a selected train throughout its journey while continuously updating its estimated or live position.
</li>

<li>
<strong>Live GPS Cast</strong><br>
Passengers may voluntarily broadcast GPS telemetry while travelling onboard, allowing supported trains to display verified live positions instead of purely simulated movement.
</li>

<li>
<strong>Spotting Mode</strong><br>
Allows railfans to discover trains approaching nearby stations or railway crossings, making it easier to plan photography and train spotting activities.
</li>

<li>
<strong>Enhanced Railway Physics</strong><br>
Movement simulation considers railway gradient, elevation profile, track curvature, acceleration, braking, traction performance, speed restrictions, and operational constraints to produce more realistic train behaviour.
</li>

<li>
<strong>Detailed Route Analytics</strong><br>
Provides interactive charts including route elevation, curvature, gradient between stations, speed profile, and operational characteristics throughout the journey.
</li>

<li>
<strong>Train Information</strong><br>
Displays operational information about each service including operator, train category, route, schedule, formation details, and other service information.
</li>

<li>
<strong>Rolling Stock Database</strong><br>
Provides information about locomotives, EMUs, DMUs, coaches, wagons, and other railway vehicles used by supported services.
</li>

<li>
<strong>Coach & Class Information</strong><br>
Displays available passenger classes together with reference illustrations where available to help passengers identify onboard accommodation.
</li>
<li>
<strong>Adaptive Train Rendering</strong><br>
Train visualization automatically adjusts according to the current map zoom level. Different rendering modes are used to maintain smooth performance while displaying thousands of simultaneously simulated trains.
</li>

<li>
<strong>Train Filtering</strong><br>
Filter trains by service category such as Intercity, Commuter, High-Speed, Metro, LRT, Freight, Heritage, and other supported railway services.
</li>

<li>
<strong>Regional Filtering</strong><br>
Display trains operating within selected operational regions (Daerah Operasi / DAOP and other railway operational divisions) for easier monitoring.
</li>

<li>
<strong>Points of Interest (POI)</strong><br>
Explore railway-related locations including train spotting locations, photography viewpoints, railway landmarks, bridges, tunnels, stations, and other notable locations along the railway network.
</li>

<li>
<strong>Depots & Maintenance Facilities</strong><br>
View railway maintenance facilities including rolling stock depots, locomotive depots, maintenance workshops (Balai Yasa), stabling yards, and other operational infrastructure.
</li>

</ul>

<div class="disclaimer-box">
<h4>Disclaimer</h4>

<p>
<strong>AluRail is primarily a timetable simulation platform.</strong>
Unless a train is actively sharing verified Live Tracking data, all train positions displayed on the map are computational estimations generated from published schedules and the platform's railway physics engine.
</p>

<p>
Although the simulation attempts to realistically reproduce railway operations, actual train movements may differ significantly due to dispatching decisions, signal aspects, operational priorities, temporary speed restrictions, maintenance work, weather conditions, delays, early departures, extraordinary operations, GPS inaccuracies, or many other real-world factors that cannot always be observed by the platform.
</p>

<p>
Even when Live Tracking is available, GPS accuracy depends on user participation, mobile device quality, satellite reception, and local environmental conditions. Therefore, displayed positions should always be considered informational rather than authoritative.
</p>

<p>
<strong>This service must not be used as an official operational reference</strong> for travel planning, ticketing decisions, passenger information, or railway operations. Always refer to official PT Kereta Api Indonesia (Persero) information channels for accurate operational updates.
</p>

<p>
AluRail / Aluline TGV is an independent community project and is not affiliated with, endorsed by, partnered with, or officially associated with PT Kereta Api Indonesia (Persero), OpenStreetMap, OpenRailwayMap, or any other referenced organizations.
</p>
</div>

<p class="footer-note">
Made with ❣️ from Pejaten, Indonesia.
</p>

Terms of Use

<section id="terms-en" class="lang-content">
<h2>Terms of Service</h2>
<p class="effective-date"><strong>Effective Date:</strong> January 1, 2025 (Updated for GAPEKA 2025)</p>

<h3>1. Acceptance of Terms</h3>
<p>By accessing AluRail through alurail.web.id, alurail.web.id, and related subdomains (collectively, the "Service"), you acknowledge that you have read, understood, and agreed to these Terms of Service. If you do not agree, you must discontinue use of the Service.</p>

<h3>2. Independent Service</h3>
<p>AluRail is an independent community project developed by Alula. It is not affiliated with, endorsed by, or operated by any railway operator, government agency, or transportation authority unless explicitly stated.</p>

<h3>3. Nature of the Service</h3>
<p>The Service provides train schedule visualization, estimated train positions, operational simulations, and crowdsourced location validation based on publicly available information, GAPEKA data, and algorithmic processing. Displayed information may differ from actual railway operations.</p>

<h3>4. No Operational Guarantee</h3>
<p>Train movements, schedules, platform assignments, delays, cancellations, dispatching decisions, and operational conditions may change without notice. The Service must not be considered an official operational information source.</p>

<h3>5. Crowdsourced Contributions</h3>
<p>Users may voluntarily contribute GPS telemetry while onboard trains. Submission of fake GPS data, manipulated locations, automated submissions, spam, or attempts to interfere with system accuracy is strictly prohibited.</p>

<h3>6. Acceptable Use</h3>
<p>You agree not to misuse the Service, interfere with its infrastructure, reverse engineer protected components, exploit security vulnerabilities, scrape excessive data, or use automated systems that negatively impact platform availability.</p>

<h3>7. Intellectual Property</h3>
<p>Unless otherwise stated, the Service, its software, interface, branding, and original content remain the intellectual property of their respective owners. Open-source components remain governed by their own licenses.</p>

<h3>8. Availability</h3>
<p>The Service may be modified, suspended, restricted, or discontinued at any time without prior notice.</p>

<h3>9. Disclaimer ("AS IS")</h3>
<p>THE SERVICE IS PROVIDED "AS IS" AND "AS AVAILABLE" WITHOUT WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, NON-INFRINGEMENT, ACCURACY, OR CONTINUOUS AVAILABILITY.</p>

<h3>10. Limitation of Liability</h3>
<p>To the fullest extent permitted by law, Alula shall not be liable for direct, indirect, incidental, consequential, special, or punitive damages arising from the use of or inability to use the Service, including travel decisions, delays, missed connections, financial loss, personal injury, or data loss.</p>

<h3>11. Changes to these Terms</h3>
<p>These Terms may be updated periodically. Continued use of the Service constitutes acceptance of the revised Terms.</p>

<h3>12. Contact</h3>
<p>Questions regarding these Terms may be directed through the official AluRail contact channels.</p>
</section>

<h3>Independent Service Disclaimer</h3>

<p>AluRail is an independent community-developed platform created by Alula for railway visualization, research, educational, and enthusiast purposes.</p>

<p>AluRail is <strong>not affiliated with, associated with, authorized by, endorsed by, sponsored by, supported by, maintained by, operated by, or officially connected with</strong> PT Kereta Api Indonesia (Persero), PT Kereta Commuter Indonesia, PT Kereta Api Logistik, PT Kereta Api Pariwisata, PT Kereta Cepat Indonesia China (Whoosh), MRT Jakarta, LRT Jabodebek, LRT Jakarta, LRT Sumatera Selatan (Palembang), their subsidiaries, affiliates, successors, government agencies, transportation authorities, or any other railway operators unless explicitly stated.</p>

<p>All company names, railway service names, station names, train names, logos, trademarks, service marks, brands, route names, and other intellectual property displayed within the Service remain the property of their respective owners and are used solely for identification, informational, interoperability, historical, mapping, educational, or descriptive purposes.</p>

<p>The visualization presented by the Service represents publicly available operational information, algorithmic estimations, historical references, and voluntary community contributions. It must not be interpreted as an official operational system, railway dispatching platform, passenger information system, or real-time control center operated by any railway company.</p>

Privacy Policy

<section id="privacy-en" class="lang-content">
<h2>Privacy Policy</h2>
<p class="effective-date"><strong>Last Updated:</strong> June 2026</p>

<h3>1. Privacy Commitment</h3>
<p>Your privacy is important to us. We collect only the information reasonably necessary to operate and improve the Service.</p>

<h3>2. GPS Collection</h3>
<p>Your GPS location is accessed only after you intentionally enable Live Tracking. Background location is never collected without your explicit action.</p>

<h3>3. Processing</h3>
<p>Submitted GPS telemetry is processed using routing algorithms including Viterbi matching against the railway network to validate train positions. Telemetry is not associated with your personal identity.</p>

<h3>4. Server Logs</h3>
<p>Standard server logs such as IP address, browser type, timestamps, and technical diagnostics may be collected for security, abuse prevention, troubleshooting, and performance monitoring.</p>

<h3>5. Data Retention</h3>
<p>Live telemetry is temporary and automatically expires after the associated trip ends unless longer retention is required for security investigations.</p>

<h3>6. Third Parties</h3>
<p>We do not sell or rent your GPS telemetry. Limited technical processing by infrastructure providers may occur solely for operating the Service.</p>

<h3>7. Security</h3>
<p>Reasonable technical and organizational safeguards are implemented, although no online system can guarantee absolute security.</p>

<h3>8. User Safety</h3>
<p>We discourage publicly sharing real-time GPS positions. Anonymous mode or pseudonyms are strongly recommended.</p>

<h3>9. Your Responsibility</h3>
<p>Use of Live GPS or spotting features is entirely voluntary and at your own risk.</p>
</section>

Open Source Notices

<section id="opensource-en" class="lang-content">
<h2>Open Source Notice</h2>
<p>AluRail is built upon numerous open-source technologies and open data projects. We sincerely thank the communities maintaining them.</p>
<ul>
<li><strong>PostgreSQL, PostGIS & pgRouting</strong> — Spatial database, GIS extension, and routing engine.</li>
<li><strong>OpenStreetMap & OpenRailwayMap</strong> — Railway infrastructure and mapping data under their respective licenses.</li>
<li><strong>Leaflet.js</strong> — Interactive mapping library.</li>
</ul>
<p>All trademarks, copyrights, and licenses belong to their respective owners. Use within AluRail does not imply endorsement by those projects.</p>
</section>

alurail for Android

Version 1.3.0 • APK (110 MB)

Download the official alurail app package for Android.

Download APK
Requires Android 8.0 (Oreo) or later
alurail Pass Prime GRATIS!
early access

alurail Pass Prime GRATIS!